INSTALLATION
Removal / installation · Vehicles built from Jan 2012
Versions by build date: Sep 2011 – Dec 2011 from Jan 2012
| 1.
INSTALL LIGHT CONTROL RHEOSTAT |
 |
- Attach the 2 claws to install the rheostat.
| 2.
INSTALL INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY
|
 |
Connect the connector.
Attach the 9 claws to install the instrument cluster finish panel.
| 3.
INSTALL NO. 2 INSTRUMENT CLUSTER FINISH PANEL GARNISH
|
 |
Attach the 2 claws to install the No. 2 instrument cluster finish panel garnish.


Text in Illustration
*A
|
w/ Entry and Start System
|
*B
|
w/o Entry and Start System
|
| 4.
INSTALL LOWER INSTRUMENT PANEL PAD SUB-ASSEMBLY LH
|
 |
- Connect the connectors and 2 clamps.
Attach the 8 claws to install the panel pad.
Install the screw.
Install the clip.
| 5.
INSTALL NO. 2 INSTRUMENT PANEL FINISH PANEL CUSHION
|
 |
- Attach the 7 claws to install the panel cushion.
| 6.
INSTALL NO. 1 INSTRUMENT CLUSTER FINISH PANEL GARNISH
|
 |
Attach the 3 claws to install the No. 1 instrument cluster finish panel garnish.