2011-2013 Land Cruiser · Service Manual Vehicle Interior

INSTALLATION

Removal / installation · Vehicles built Sep 2011 – Dec 2011

Versions by build date: Sep 2011 – Dec 2011 from Jan 2012


1. INSTALL LIGHT CONTROL RHEOSTAT

  1. E154735
    Attach the 2 claws to install the rheostat.


2. INSTALL INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY

B180017
  1. Connect the connector.

  1. Attach the 9 claws to install the instrument cluster finish panel.


3. INSTALL NO. 2 INSTRUMENT CLUSTER FINISH PANEL GARNISH

  1. Attach the 2 claws to install the No. 2 instrument cluster finish panel garnish.

    B291252E01

    Text in Illustration 
    *A
    w/ Entry and Start System
    *B
    w/o Entry and Start System


4. INSTALL LOWER INSTRUMENT PANEL PAD SUB-ASSEMBLY LH

  1. B181910
    Connect the connectors and 2 clamps.

  1. Attach the 8 claws to install the panel pad.

  1. Install the screw.

  1. Install the clip.


5. INSTALL NO. 2 INSTRUMENT PANEL FINISH PANEL CUSHION

  1. E155134
    Attach the 7 claws to install the panel cushion.


6. INSTALL NO. 1 INSTRUMENT CLUSTER FINISH PANEL GARNISH

E155133
  1. Attach the 3 claws to install the No. 1 instrument cluster finish panel garnish.

← INSPECTION (from Sep 2011)INSTALLATION (from Jan 2012) →