2011-2013 Land Cruiser · Service Manual Drivetrain

INSPECTION

Inspection · Vehicles built from Sep 2011


INSPECT REAR PROPELLER SHAFT ASSEMBLY

  1. C172483
    Using a dial indicator, measure the propeller shaft runout.

    Maximum runout:
    0.8 mm (0.031 in.)

    If the shaft runout is more than the maximum, replace the shaft.


INSPECT SPIDER BEARING

C175289

NOTICE:
Be careful not to grip the propeller shaft tube too tightly in a vise as this will cause deformation.

  1. Check the spider bearings for wear or damage.

  1. Check the axial play of each spider bearing by turning the yoke while holding the shaft tightly.

    Maximum bearing axial play:
    0 mm (0 in.)

    If the axial play is more than the maximum, replace the spider bearing.

← DISASSEMBLY (from Sep 2011)REASSEMBLY (from Sep 2011) →