2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

INSTALLATION

Removal / installation · Vehicles built Sep 2011 – Dec 2011

Versions by build date: Sep 2011 – Dec 2011 from Jan 2012


1. INSTALL NO. 2 INLET TURBO OIL PIPE SUB-ASSEMBLY (for Bank 2)

  1. A170297E01
    Temporarily install a new gasket and the No. 2 inlet turbo oil pipe with the union bolt and bolt.

  1. Tighten the union bolt and bolt in the order shown in the illustration.

    Torque:
    for union bolt:
    29 N*m{ 296 kgf*cm , 21 ft.*lbf }
    for bolt:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }


2. INSTALL NO. 2 TURBO OIL PIPE (for Bank 2)

  1. A170314
    Install a new gasket and the No. 2 turbo oil pipe with the 2 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

    HINT:
    The gasket claws should face the pipe.


3. INSTALL NO. 2 INLET COMPRESSOR ELBOW (for Bank 2)

  1. A174716
    Install a new gasket and the No. 2 inlet compressor elbow with the 2 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

    HINT:
    Install the No. 2 inlet compressor elbow with the "L" mark facing toward the outside of the vehicle.


4. INSTALL NO. 2 TURBOCHARGER SUB-ASSEMBLY WITH EXHAUST MANIFOLD LH (for Bank 2)

  1. A177392
    Set a new gasket to the No. 2 turbocharger.

  1. Install the exhaust manifold LH to the No. 2 turbocharger with 3 new nuts.

    Torque:
    60 N*m{ 612 kgf*cm , 44 ft.*lbf }

    HINT:
    The gasket claw should face toward the outside of the vehicle.

  1. A177409
    Set a new gasket to the cylinder head LH.

  1. A177394
    Install the No. 2 turbocharger with exhaust manifold LH and 10 collars to the cylinder head LH with 10 new nuts.

    Torque:
    36 N*m{ 367 kgf*cm , 27 ft.*lbf }

    HINT:
    Install the collars with the colored side facing the nuts.

  1. A177391
    Install a new gasket and the No. 2 inlet turbo oil pipe to the No. 1 oil pan with the union bolt.

    Torque:
    29 N*m{ 296 kgf*cm , 21 ft.*lbf }

  1. A179471
    Connect the 2 connectors to the turbocharger.


5. INSTALL NO. 2 VENTILATION TUBE SUB-ASSEMBLY (for Bank 2)

  1. A177390E01
    Temporarily install a new gasket and the No. 2 ventilation tube with the union bolt and bolt.

  1. Tighten the union bolt and bolt in the order shown in the illustration.

    Torque:
    for union bolt:
    29 N*m{ 296 kgf*cm , 21 ft.*lbf }
    for bolt:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

    NOTICE:
    Clean and remove any oil labeled 1shown in the illustration.

  1. Connect the No. 2 vacuum transmitting hose.


6. INSTALL NO. 2 TURBOCHARGER STAY (for Bank 2)

  1. A177389
    Install the No. 2 turbocharger stay with the 2 bolts.

    Torque:
    49 N*m{ 495 kgf*cm , 36 ft.*lbf }


7. CONNECT NO. 2 OUTLET TURBO OIL HOSE (for Bank 2)

HINT:
A177388E01
Align the white paint marks on the oil hose and pipe, and connect the hose.


8. INSTALL NO. 2 TURBO WATER PIPE SUB-ASSEMBLY (for Bank 2)

  1. A170290E01
    Temporarily install a new gasket and the No. 2 turbo water pipe with the union bolt and bolt.

  1. Tighten the union bolt and bolt in the order shown in the illustration.

    Torque:
    for union bolt:
    35 N*m{ 357 kgf*cm , 26 ft.*lbf }
    for bolt:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Connect the water hose to the pipe.


9. INSTALL FRONT WATER BY-PASS JOINT (for Bank 2)

  1. A177435
    Install a new gasket and the front water by-pass joint.

    Torque:
    50 N*m{ 510 kgf*cm , 37 ft.*lbf }


10. INSTALL NO. 3 TURBO WATER PIPE SUB-ASSEMBLY (for Bank 2)

  1. A177386E01
    Temporarily install a new gasket and the No. 3 turbo water pipe with the union bolt and 2 bolts.

  1. Tighten the union bolt and 2 bolts in the order shown in the illustration.

    Torque:
    for union bolt:
    35 N*m{ 357 kgf*cm , 26 ft.*lbf }
    for bolt:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }


11. INSTALL NO. 2 EXHAUST MANIFOLD HEAT INSULATOR (for Bank 2)

  1. A177385
    Install the No. 2 exhaust manifold heat insulator with the 3 bolts.

    Torque:
    25 N*m{ 255 kgf*cm , 18 ft.*lbf }


12. CONNECT NO. 2 TURBO WATER HOSE (for Bank 2)

A177384

13. CONNECT BREATHER PLUG LH (for Bank 2)

A177383

14. CONNECT NO. 3 VENTILATION HOSE (for Bank 2)

A177382

15. INSTALL NO. 1 INLET TURBO OIL PIPE SUB-ASSEMBLY (for Bank 1)

  1. A170313E01
    Temporarily install a new gasket and the No. 1 inlet turbo oil pipe with the union bolt and bolt.

  1. Tighten the union bolt and bolt in the order shown in the illustration.

    Torque:
    for union bolt:
    29 N*m{ 296 kgf*cm , 21 ft.*lbf }
    for bolt:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }


16. INSTALL NO. 1 TURBO OIL PIPE (for Bank 1)

  1. A170298
    Install a new gasket and the No. 1 turbo oil pipe with the 2 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }


17. INSTALL NO. 1 INLET COMPRESSOR ELBOW (for Bank 1)

  1. A174717
    Install a new gasket and the No. 1 inlet compressor elbow with the 2 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

    HINT:
    Install the No. 1 inlet compressor elbow with the "R" mark facing toward the outside of the vehicle.


18. INSTALL NO. 1 TURBOCHARGER SUB-ASSEMBLY WITH EXHAUST MANIFOLD RH (for Bank 1)

  1. A170312
    Set a new gasket to the No. 1 turbocharger.

  1. Install the exhaust manifold RH to the No. 1 turbocharger with 2 new nuts and the bolt.

    Torque:
    60 N*m{ 612 kgf*cm , 44 ft.*lbf }

  1. A177408
    Set a new gasket to the cylinder head RH.

  1. A170311E02
    Install the No. 1 turbocharger with exhaust manifold RH to the cylinder head RH with the 10 collars and 10 new nuts.

    Torque:
    36 N*m{ 367 kgf*cm , 27 ft.*lbf }

    HINT:
    Install the collars with the colored side facing the nuts.

  1. A177405
    Install a new gasket and the No. 1 inlet turbo oil pipe to the cylinder block with the union bolt.

    Torque:
    Case is dry:
    29 N*m{ 296 kgf*cm , 21 ft.*lbf }
    Case is wet:
    23 N*m{ 235 kgf*cm , 17 ft.*lbf }

    NOTICE:
    1. The case is "dry" when there is absolutely no engine oil on the union bolt and cylinder block bolt hole.
    2. The case is "wet" when there is engine oil on the union bolt and cylinder block bolt hole.


19. INSTALL NO. 1 VENTILATION TUBE SUB-ASSEMBLY (for Bank 1)

  1. A177404E01
    Temporarily install a new gasket and the No. 1 ventilation tube with the union bolt and bolt.

  1. Tighten the union bolt and bolt in the order shown in the illustration.

    Torque:
    for union bolt:
    29 N*m{ 296 kgf*cm , 21 ft.*lbf }
    for bolt:
    10 N*m{ 102 kgf*cm , 7 in.*lbf }

    NOTICE:
    Clean and remove any oil labeled 1 shown in the illustration.

  1. Connect the vacuum hose.


20. INSTALL NO. 1 TURBOCHARGER STAY (for Bank 1)

  1. A177403
    Temporarily install the No. 1 turbocharger stay with the 2 bolts.

  1. Tighten the 2 bolts.

    Torque:
    49 N*m{ 495 kgf*cm , 36 ft.*lbf }


21. INSTALL NO. 1 TURBO WATER PIPE SUB-ASSEMBLY (for Bank 1)

  1. A177401E01
    Install a new gasket and the No. 1 turbo water pipe with 2 new nuts and 3 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Connect the water hose.


22. CONNECT NO. 1 OUTLET TURBO OIL HOSE (for Bank 1)

A177402

23. INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR (for Bank 1)

  1. A177400
    Install the No. 1 exhaust manifold heat insulator with the 3 bolts.

    Torque:
    25 N*m{ 255 kgf*cm , 18 ft.*lbf }


24. CONNECT NO. 2 TURBO WATER HOSE (for Bank 1)

A177399

25. CONNECT BREATHER PLUG RH (for Bank 1)

A177398

26. CONNECT NO. 2 VENTILATION HOSE (for Bank 1)

A177397

27. INSTALL NO. 1 INTAKE AIR CONNECTOR PIPE (for Bank 1)

  1. A177381
    Install the No. 1 intake air connector pipe with the bolt. Then tighten the hose clamp.

    Torque:
    for bolt:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }
    for clamp:
    6.0 N*m{ 61 kgf*cm , 53 in.*lbf }

  1. A174753
    Connect the 4 connectors and attach the 5 wire harness clamps.


28. INSTALL NO. 1 ENGINE OIL LEVEL DIPSTICK GUIDE (for Bank 1)

  1. A170301
    Apply a light coat of engine oil to a new O-ring and install it to the No. 1 engine oil level dipstick guide.

  1. Install the No. 1 engine oil level dipstick guide with the 2 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }


29. INSTALL ENGINE ASSEMBLY
  1. Install the engine assembly to the vehicle (Click here).


30. INSPECT FOR OIL LEAK
  1. Warm up the engine and check for an engine oil leak.


31. INSPECT FOR COOLANT LEAK

CAUTION:
Do not remove the radiator reservoir cap while the engine and radiator are still hot. Pressurized, hot engine coolant and steam may be released and cause serious burns.

  1. A174739
    Fill the radiator with coolant and attach a radiator cap tester to the radiator reservoir.

  1. Warm up the engine.

  1. Using the radiator cap tester, increase the pressure inside the radiator to 123 kPa (1.3 kgf/cm2, 17.8 psi), and check that the pressure does not drop.
    If the pressure drops, check the hoses, radiator and water pump for leaks.
    If no external leaks are found, check the cylinder block and cylinder head.


32. CHECK ENGINE OIL LEVEL
  1. Warm up the engine, stop the engine and wait 5 minutes. The engine oil level should be between the dipstick low level mark and full level mark.
    If low, check for leakage and add oil up to the full level mark.

    NOTICE:
    Do not fill engine oil above the full level mark.


33. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).

  1. Connect the cables to negative (-) main battery and sub-battery terminals.

← INSPECTION (from Jan 2012)INSTALLATION (from Jan 2012) →