2011-2013 Land Cruiser · Service Manual Vehicle Interior

INSTALLATION

Removal / installation · Vehicles built from Jan 2012

Versions by build date: Sep 2011 – Dec 2011 from Jan 2012


1. INSTALL NO. 2 AIR CONDITIONING CONTROL ASSEMBLY (w/ Rear Air Conditioning System)

E157146
  1. Attach the 5 claws to install the air conditioning control.

  1. Install the 4 screws.


2. INSTALL AIR CONDITIONING CONTROL ASSEMBLY (w/o Rear Air Conditioning System)

E154965
  1. Attach the 5 claws to install the air conditioning control.

  1. Install the 4 screws.


3. INSTALL REAR CONSOLE END PANEL SUB-ASSEMBLY
  1. w/o Cool Box:
    (Click here)

  1. w/o Cool Box:
    (Click here)

← INSTALLATION (Sep 2011 – Dec 2011)COMPONENTS (from Sep 2011) →