2011-2013 Land Cruiser · Service Manual Suspension

REASSEMBLY

Removal / installation · Vehicles built from Sep 2011


1. INSTALL STABILIZER CONTROL ADAPTER SHUTTER VALVE (for Lower Chamber Side)

C174266E01
  1. Apply a small amount of suspension fluid to a new O-ring and install it to the shutter valve.

  1. Install the shutter valve to the adapter housing.

    Torque:
    14 N*m{ 143 kgf*cm , 10 ft.*lbf }


2. INSTALL STABILIZER CONTROL ADAPTER SHUTTER VALVE (for Upper Chamber Side)

HINT:
Use the same procedures described for the lower chamber side.


3. INSTALL OIL NOZZLE VALVE SUB-ASSEMBLY (for Lower Chamber Side)
  1. Before installing the oil nozzle valve, apply suspension fluid to the oil nozzle valve O-ring.

  1. C174265E01
    Install the oil nozzle valve to the adapter housing.

    Torque:
    12 N*m{ 122 kgf*cm , 9 ft.*lbf }


4. INSTALL OIL NOZZLE VALVE SUB-ASSEMBLY (for Upper Chamber Side)

HINT:
Use the same procedures described for the lower chamber side.


5. INSTALL SERVICE VALVE CAP (for Lower Chamber Side)

C174264E01
  1. Install the valve cap to the oil nozzle valve.

    Torque:
    0.6 N*m{ 6.0 kgf*cm , 5.0 in.*lbf }


6. INSTALL SERVICE VALVE CAP (for Upper Chamber Side)

HINT:
Use the same procedures described for the lower chamber side.

← DISASSEMBLY (from Sep 2011)INSTALLATION (Sep 2011 – Dec 2011) →