2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

INSTALLATION

Removal / installation · Vehicles built from Jan 2012

Versions by build date: Sep 2011 – Dec 2011 from Jan 2012

NOTICE:
  1. When replacing an injector (including interchanging injectors between cylinders) or common rail, replace the corresponding injection pipes with new ones.
  2. w/DPF
    When fuel lines are disconnected, air may enter the fuel lines, leading to engine starting trouble. Therefore, perform forced regeneration and bleed the air from the fuel lines (Click here).


1. INSTALL FRONT ENGINE MOUNTING INSULATOR RH

  1. A176553
    Install the mounting insulator with the nut.

    Torque:
    80 N*m{ 816 kgf*cm , 59 ft.*lbf }

  1. Connect the vacuum hose.


2. INSTALL FRONT ENGINE MOUNTING INSULATOR LH

  1. A176552
    Install the mounting insulator with the nut.

    Torque:
    80 N*m{ 816 kgf*cm , 59 ft.*lbf }


3. INSTALL ENGINE ASSEMBLY
  1. Install the engine assembly (Click here).

← INSTALLATION (Sep 2011 – Dec 2011)COMPONENTS (from Sep 2011) →