2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

INSTALLATION

Removal / installation · Vehicles built Sep 2011 – Dec 2011

Versions by build date: Sep 2011 – Dec 2011 from Jan 2012


1. INSTALL FRONT ENGINE MOUNTING INSULATOR RH

  1. A176553
    Install the mounting insulator with the nut.

    Torque:
    80 N*m{ 816 kgf*cm , 59 ft.*lbf }

  1. Connect the vacuum hose.


2. INSTALL FRONT ENGINE MOUNTING INSULATOR LH

  1. A176552
    Install the mounting insulator with the nut.

    Torque:
    80 N*m{ 816 kgf*cm , 59 ft.*lbf }


3. INSTALL ENGINE ASSEMBLY
  1. Install the engine assembly (Click here).

← INSPECTION (from Sep 2011)INSTALLATION (from Jan 2012) →