2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

INSTALLATION

Removal / installation · Vehicles built from Jan 2012


1. INSTALL PCV VALVE SUB-ASSEMBLY

  1. A214274E02
    Apply a light coat of engine oil to the O-ring.
    Text in Illustration 
    *1
    O-ring

    HINT:
    1. When reusing the PCV valve, inspect the O-ring.
    2. If the O-ring has scratches or cuts, replace the PCV valve.

  1. Using a 22 mm ball joint lock nut wrench, install the PCV valve sub-assembly.

    Torque:
    3.5 N*m{ 36 kgf*cm , 31 in.*lbf }

    NOTICE:
    Use the formula to calculate special torque values for situations where a ball joint lock nut wrench is combined with a torque wrench (Click here).


2. INSTALL PCV HOSE

  1. A219182E01
    Connect the PCV valve hose to the valve.

  1. Secure the hose with the clamp.

    Text in Illustration 
    *a
    Upper Side
    *b
    5 to 10 mm (0.197 to 0.394 in.)

    HINT:
    Make sure the direction of the hose clamp is as shown in the illustration.


3. INSTALL NO. 3 ENGINE COVER

  1. A220035
    Install the No. 3 engine cover.
    Text in Illustration 
    V100135
    Engine Front

    HINT:
    Position the No. 3 engine cover so that the arrow mark faces the front of the engine and install it.


4. INSTALL NO. 4 ENGINE COVER

  1. A220036
    Install the No. 4 engine cover.
    Text in Illustration 
    V100135
    Engine Front

    HINT:
    Position the No. 4 engine cover so that the arrow mark faces the front of the engine and install it.


5. INSTALL INTAKE MANIFOLD
(Click here)
← INSPECTION (from Jan 2012)PARTS LOCATION (from Sep 2011) →