2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

INSPECTION

Inspection · Vehicles built from Jan 2012


INSPECT PCV VALVE SUB-ASSEMBLY
  1. Install a clean hose to the PCV valve.

  1. Check the PCV valve operation.

    1. A158645E05
      Blow air into the cylinder head side and check that air passes through easily.
      Text in Illustration 
      *1
      Clean Hose
      V100135
      Air

      CAUTION:
      Do not suck air through the valve.
      Petroleum substances inside the valve are hazardous to your health.

    2. A158646E05
      Blow air into the intake manifold side and check that air passes through with difficulty.
      Text in Illustration 
      *1
      Clean Hose
      V100135
      Air
      If the result is not as specified, replace the PCV valve sub-assembly.

  1. Remove the clean hose from the PCV valve.

← REMOVAL (from Jan 2012)INSTALLATION (from Jan 2012) →