Home › Engine / Hybrid System › 1UR-FE (ENGINE CONTROL) › SFI SYSTEM › 2015.08–2016.08
RM2660E _51 Engine / Hybrid System _052772 1UR-FE ENGINE CONTROL _0254983 SFI SYSTEM J

1UR-FE ENGINE CONTROL  SFI SYSTEM  ECM Power Source Circuit  


DESCRIPTION

When the engine switch is turned on (IG), the battery voltage is applied to the IGSW of the ECM. The output signal from the MREL terminal of the ECM causes a current to flow to the coil, closing the contacts of the integration relay (EFI MAIN NO. 1 relay) and supplying power to either terminal +B or +B2 of the ECM.

WIRING DIAGRAM

A372425E04
3.625,4.271 4.521,4.438 0.896,0.167 10 false *1: for RHD 3.625,4.625 4.521,4.792 0.896,0.167 10 false *2: for LHD 6.438,4.802 6.844,5 0.406,0.198 10 false ECM 6.146,0.896 6.563,1.073 0.417,0.177 10 false IGSW 5.771,1.021 6.063,1.177 0.292,0.156 10 false A38 5.771,1.708 6.063,1.865 0.292,0.156 10 false A38 5.781,2.271 6.073,2.427 0.292,0.156 10 false A38 5.781,3.26 6.073,3.417 0.292,0.156 10 false A38 5.771,4.26 6.063,4.417 0.292,0.156 10 false C45 5.75,0.813 6.094,0.969 0.344,0.156 10 false 28*2 5.813,1.49 6.104,1.646 0.292,0.156 10 false 3*2 5.792,2.052 6.083,2.208 0.292,0.156 10 false 2*2 4.635,3.052 4.792,3.219 0.156,0.167 10 false 8 4.635,2.5 4.781,2.667 0.146,0.167 10 false 4 4.604,2.052 4.823,2.24 0.219,0.188 10 false 11 1.458,1.625 1.615,1.781 0.156,0.156 10 false 2 4.646,0.802 4.75,0.958 0.104,0.156 10 false 7 5.771,4.031 6.177,4.229 0.406,0.198 10 false 81*2 5.75,3.021 6.115,3.219 0.365,0.198 10 false 34*2 2.802,2.948 3.927,3.115 1.125,0.167 10 false EFI MAIN NO. 1 2.375,1.146 3.021,1.313 0.646,0.167 10 false IG2 MAIN 3.677,1.24 4.802,1.438 1.125,0.198 10 false ENG-IG2 NO. 1 1.563,4.073 1.938,4.229 0.375,0.156 10 false IG1D 1.375,3.979 1.552,4.135 0.177,0.156 10 false 3 1.385,4.573 1.813,4.76 0.427,0.188 10 false E128 1.385,4.771 3.24,5.177 1.854,0.406 10 false Certification ECU Assembly (Smart Key ECU Assembly) 0.542,3.969 1.031,4.156 0.49,0.188 10 false Battery 6.156,1.635 6.365,1.802 0.208,0.167 10 false +B 6.156,2.271 6.448,2.438 0.292,0.167 10 false +B2 6.167,3.146 6.604,3.333 0.438,0.188 10 false MREL 6.156,4.229 6.354,4.385 0.198,0.156 10 false E1 4.604,3.26 4.813,3.427 0.208,0.167 10 false 1S 4.583,2.281 4.792,2.448 0.208,0.167 10 false 1S 1.385,1.833 1.594,2 0.208,0.167 10 false 1R 4.583,1.031 4.792,1.198 0.208,0.167 10 false 1P 4.583,2.708 4.792,2.875 0.208,0.167 10 false 1S 3.292,3.646 4.917,3.885 1.625,0.24 10 false No. 2 Integration Relay 0.396,2.667 0.844,2.865 0.448,0.198 10 false P/I-B 3.052,1.625 3.698,1.792 0.646,0.167 10 false IG2 MAIN 2.396,2.406 3.094,2.76 0.698,0.354 10 false EFI MAIN NO. 1 5.396,1.021 5.688,1.177 0.292,0.156 10 false A52 5.385,1.698 5.677,1.854 0.292,0.156 10 false A52 5.396,2.281 5.688,2.438 0.292,0.156 10 false A52 5.396,3.25 5.688,3.406 0.292,0.156 10 false A52 5.375,4.26 5.667,4.417 0.292,0.156 10 false C46 5.375,0.823 5.75,0.979 0.375,0.156 10 false 28*1 5.385,4.031 5.792,4.229 0.406,0.198 10 false 81*1 5.365,3.031 5.729,3.219 0.365,0.188 10 false 34*1 5.417,1.5 5.708,1.656 0.292,0.156 10 false 3*1 5.438,2.063 5.729,2.219 0.292,0.156 10 false 2*1 1.458,0.813 1.583,0.979 0.125,0.167 10 false 1 1.396,1.021 1.656,1.198 0.26,0.177 10 false 1X 1.396,1.198 1.656,1.375 0.26,0.177 10 false *1 1.792,0.802 1.917,0.969 0.125,0.167 10 false 1 1.729,1.01 1.99,1.188 0.26,0.177 10 false 1Y 1.771,1.198 2.031,1.375 0.26,0.177 10 false *2

CAUTION / NOTICE / HINT

NOTICE:

Inspect the fuses for circuits related to this system before performing the following inspection procedure.


PROCEDURE

1.INSPECT NO. 2 INTEGRATION RELAY (POWER SOURCE)
a.
U163779E01
0.212,0.264 2.673,0.674 2.461,0.411 10 Front view of wire harness connector: (to No. 2 integration relay) 0.622,1.642 0.884,1.824 0.262,0.182 10 1X 0.954,1.619 1.216,1.801 0.262,0.182 10 *1 0.954,1.94 1.216,2.122 0.262,0.182 10 *2 0.622,1.98 0.884,2.162 0.262,0.182 10 1Y 0.37,2.747 1.155,2.930 0.786,0.182 10 *1: for RHD 1.475,2.747 2.261,2.930 0.786,0.182 10 *2: for LHD

Disconnect the No. 2 integration relay connector.


b.

Measure the voltage according to the value(s) in the table below.

Standard Voltage:
for RHD
Tester Connection Switch Condition Specified Condition
1X-1 - Body ground Always 11 to 14 V

for LHD
Tester Connection Switch Condition Specified Condition
1Y-1 - Body ground Always 11 to 14 V




OK

2.CHECK HARNESS AND CONNECTOR (NO. 2 INTEGRATION RELAY - BODY GROUND)

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR (BATTERY - NO. 2 INTEGRATION RELAY)

2.CHECK HARNESS AND CONNECTOR (NO. 2 INTEGRATION RELAY - BODY GROUND)
a.

Disconnect the No. 2 integration relay connector.


b.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
1S-4 - Body ground Always Below 1 Ω




OK

3.INSPECT NO. 2 INTEGRATION RELAY (IG2 MAIN, EFI MAIN NO. 1)

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

3.INSPECT NO. 2 INTEGRATION RELAY (IG2 MAIN, EFI MAIN NO. 1)
a.

Inspect the No. 2 integration relay (See page Engine / Hybrid System>1UR-FE (ENGINE CONTROL)>RELAY>ON-VEHICLE INSPECTION).



OK

4.CHECK HARNESS AND CONNECTOR (NO. 2 INTEGRATION RELAY - ECM)

NG

REPLACE NO. 2 INTEGRATION RELAY

4.CHECK HARNESS AND CONNECTOR (NO. 2 INTEGRATION RELAY - ECM)
a.

Disconnect the ECM connector.


b.

Disconnect the No. 2 integration relay connector.


c.

Measure the resistance according to the value(s) in the table below.

Standard Resistance (for RHD):
Tester Connection Condition Specified Condition
A52-34 (MREL) - 1S-8 Always Below 1 Ω
A52-3 (+B) - 1S-11 Always Below 1 Ω
A52-2 (+B2) - 1S-11 Always Below 1 Ω
A52-34 (MREL) or 1S-8 - Body ground Always 10 kΩ or higher
A52-3 (+B) or 1S-11 - Body ground Always 10 kΩ or higher
A52-2 (+B2) or 1S-11 - Body ground Always 10 kΩ or higher


Standard Resistance (for LHD):
Tester Connection Condition Specified Condition
A38-34 (MREL) - 1S-8 Always Below 1 Ω
A38-3 (+B) - 1S-11 Always Below 1 Ω
A38-2 (+B2) - 1S-11 Always Below 1 Ω
A38-34 (MREL) or 1S-8 - Body ground Always 10 kΩ or higher
A38-3 (+B) or 1S-11 - Body ground Always 10 kΩ or higher
A38-2 (+B2) or 1S-11 - Body ground Always 10 kΩ or higher




OK

5.CHECK HARNESS AND CONNECTOR (ECM - BODY GROUND)

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

5.CHECK HARNESS AND CONNECTOR (ECM - BODY GROUND)
a.

Disconnect the ECM connector.


b.

Measure the resistance according to the value(s) in the table below.

Standard Resistance (for RHD):
Tester Connection Condition Specified Condition
C46-81 (E1) - Body ground Always Below 1 Ω


Standard Resistance (for LHD):
Tester Connection Condition Specified Condition
C45-81 (E1) - Body ground Always Below 1 Ω




OK

6.INSPECT ECM (IGSW VOLTAGE)

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

6.INSPECT ECM (IGSW VOLTAGE)
a.
U162916E01
2.141,1.736 1.994,1.077 false 1.04,0.989 1.811,1.193 0.772,0.204 10 28 (IGSW) 0.074,0.034 2.420,0.401 2.346,0.367 10 Front view of wire harness connector: (to ECM) 2.653,1.528 2.956,1.694 0.302,0.166 10 A52 2.653,1.904 2.956,2.069 0.302,0.166 10 A38 0.491,2.585 1.389,2.755 0.897,0.169 10 *1: for RHD 1.559,2.585 2.457,2.755 0.897,0.169 10 *2: for LHD 3.055,1.49 3.282,1.659 0.227,0.169 10 *1 3.055,1.866 3.282,2.035 0.227,0.169 10 *2 2.002,1.082 1.879,1.082 false

Disconnect the ECM connectors.


b.

Turn the engine switch on (IG).


c.

Measure the voltage according to the value(s) in the table below.

Standard Voltage (for RHD):
Tester Connection Switch Condition Specified Condition
A52-28 (IGSW) - Body ground Engine switch on (IG) 11 to 14 V


Standard Voltage (for LHD):
Tester Connection Switch Condition Specified Condition
A38-28 (IGSW) - Body ground Engine switch on (IG) 11 to 14 V




OK

NG

7.CHECK HARNESS AND CONNECTOR (NO. 2 INTEGRATION RELAY - ECM)
7.CHECK HARNESS AND CONNECTOR (NO. 2 INTEGRATION RELAY - ECM)
a.

Disconnect the ECM connector.


b.

Disconnect the No. 2 integration relay connector.


c.

Measure the resistance according to the value(s) in the table below.

Standard Resistance (for RHD):
Tester Connection Condition Specified Condition
A52-28 (IGSW) - 1P-7 Always Below 1 Ω
A52-28 (IGSW) or 1P-7 - Body ground Always 10 kΩ or higher


Standard Resistance (for LHD):
Tester Connection Condition Specified Condition
A38-28 (IGSW) - 1P-7 Always Below 1 Ω
A38-28 (IGSW) or 1P-7 - Body ground Always 10 kΩ or higher




OK

8.CHECK HARNESS AND CONNECTOR (SMART KEY ECU ASSEMBLY - NO. 2 INTEGRATION RELAY)

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

8.CHECK HARNESS AND CONNECTOR (SMART KEY ECU ASSEMBLY - NO. 2 INTEGRATION RELAY)
a.

Disconnect the smart key ECU assembly connector.


b.

Disconnect the No. 2 integration relay connector.


c.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
E128-3 (IG1D) - 1R-2 Always Below 1 Ω
E128-3 (IG1D) or 1R-2 - Body ground Always 10 kΩ or higher




OK

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR