Home › Engine / Hybrid System › 1VD-FTV (EMISSION CONTROL) › EGR COOLER › 2014.08–2015.08
RM2660E _51 Engine / Hybrid System _052786 1VD-FTV EMISSION CONTROL _0255149 EGR COOLER A

1VD-FTV EMISSION CONTROL  EGR COOLER  INSTALLATION  


PROCEDURE

Hide 1.INSTALL STUD BOLT

a.

Using an E6 "TORX" socket wrench, install the 4 stud bolts to the EGR cooler.

Torque:
6.0 N*m (61 kgf*cm, 53 in.*lbf)


Hide 16296 2.INSTALL NO. 8 WATER BY-PASS HOSE

a.

Install the 2 No. 8 water by-pass hoses.


Hide 16279 3.INSTALL NO. 3 WATER BY-PASS PIPE

a.

Connect the 2 hoses and install the No. 3 water by-pass pipe with the bolt.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


Hide 4.INSTALL NO. 1 AND NO. 2 EGR VALVE ASSEMBLIES