Home › Steering › STEERING GEAR / LINKAGE › STEERING LINKAGE
RM2660E _55 Steering _052827 STEERING GEAR / LINKAGE _0255463 STEERING LINKAGE G

STEERING GEAR / LINKAGE  STEERING LINKAGE  INSPECTION  


CAUTION / NOTICE / HINT

HINT:
·

Use the same procedure for RHD and LHD vehicles.

·

The procedure listed below is for LHD vehicles.



PROCEDURE

Hide 45047 1.INSPECT TIE ROD END SUB-ASSEMBLY LH

a.
ZK08184

Install the nut.


b.

Flip the ball joint stud back and forth 5 times as shown in the illustration.


c.

Using a torque wrench, turn the nut continuously at a rate of 3 to 5 seconds per turn and check the torque reading on the 5th turn.

Torque:

0.98 to 3.92 N*m (10.0 to 35.0 kgf*cm, 8.67 to 30.36 in.*lbf)



Hide 2.INSPECT TOTAL PRELOAD

a.
C178119E01
2.437,0.181 3.207,0.323 0.770,0.142 10 Dust Cover 1.956,0.454 2.124,0.286 false 2.124,0.286 2.402,0.286 false 1.801,0.933 1.801,1.406 false 0.164,0.933 0.898,1.082 0.734,0.149 10 Matchmark 1.056,1.036 1.784,1.036 false

Put matchmarks on the dust cover and steering link.


b.

Remove the dust cover.


c.

Temporarily install the 2 steering rack ends to the power steering rack.

NOTICE:

Do not fully turn the power steering rack without the steering rack ends as it may damage the oil seal in the rack housing.



d.
C172444E01
1.821,0.037 2.161,0.236 0.340,0.199 10 SST 2.221,0.149 2.559,0.149 false 2.559,0.149 2.786,0.564 false

Using SST, fully turn the power steering rack right and left 10 times to settle it.

SST
09616-00011  


e.
C172445E01
1.378,0.14 1.776,0.321 0.398,0.180 10 SST 2.116,0.702 1.951,0.217 false 1.951,0.217 1.742,0.217 false

Using SST, turn the control valve and measure the preload.

SST
09616-00011  

Standard preload (turning):

2.05 to 2.85 N*m (21.0 to 29.0 kgf*cm, 19 to 25 in.*lbf)


If the turning torque is not as specified, replace the power steering link.

NOTICE:

After setting the steering rack to the neutral point, align the dust cover rib with the power steering protrusion.


HINT:
·

Measure the standard preload at the steering rack neutral point.

·

The steering control valve is fully turned when turned 3.14 times. Half of the distance from the fully turned position is the neutral point.




f.

After inspecting the preload, align the matchmarks and install the dust cover.