1.INSPECT WINCH MAIN RELAY
Push in the plunger and release it. Check that it returns quickly to its original position.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| A - B | Battery voltage is not applied to terminals 1 and 2 | 10 MΩ or higher |
| Battery voltage is applied to terminals 1 and 2 | Below 1 Ω |
If the result is not as specified, replace the winch main relay.