Home › Engine / Hybrid System › 1UR-FE (ENGINE CONTROL) › SFI SYSTEM › from 2016.08
RM2660E _51 Engine / Hybrid System _052772 1UR-FE ENGINE CONTROL _0254983 SFI SYSTEM C

1UR-FE ENGINE CONTROL  SFI SYSTEM  P144C  Open in Secondary Air Injection System Heater Control Circuit  P144D  Short in Secondary Air Injection System Heater Control Circuit  


DESCRIPTION

The ECM operates the air pump heater relay (AIR PMP HTR) which causes the air pump heater to operate.

DTC No. DTC Detection Condition Trouble Area
P144C Open or short in the air pump heater relay circuit for 5 seconds (1 trip detection logic).
·

Open or short in air pump heater relay circuit

·

No. 2 Integration Relay (AIR PMP HTR)

·

ECM


P144D Open or short in the air pump heater relay circuit for 5 seconds (1 trip detection logic).
·

Open or short in air pump heater relay circuit

·

No. 2 Integration Relay (AIR PMP HTR)

·

ECM



WIRING DIAGRAM

CAUTION / NOTICE / HINT

NOTICE:

Inspect the fuses of circuits related to this system before performing the following inspection procedure.


HINT:

Read freeze frame data using the GTS. Freeze frame data records the engine condition when malfunctions are detected. When troubleshooting, freeze frame data can help determine if the vehicle was moving or stationary, if the engine was warmed up or not, if the air-fuel ratio was lean or rich, and other data from the time the malfunction occurred.


PROCEDURE

1.INSPECT NO. 2 INTEGRATION RELAY (AIR PMP HTR)
a.

Inspect the No. 2 integration relay (AIR PMP HTR) (See page Engine / Hybrid System>1UR-FE (ENGINE CONTROL)>RELAY>ON-VEHICLE INSPECTION).



OK

2.CHECK NO. 2 INTEGRATION RELAY (AIR PMP HTR) (POWER SOURCE)

NG

REPLACE AIR PUMP HEATER RELAY (AIR PMP HTR)

2.CHECK NO. 2 INTEGRATION RELAY (AIR PMP HTR) (POWER SOURCE)
a.
A299433C17
0.49,1.021 0.906,1.313 0.417,0.292 0.625,1.104 0.938,1.302 0.313,0.198 10 false 1X 0.135,0.125 0.448,0.281 0.313,0.156 10 false *a
*a Front view of wire harness connector
(to No. 2 integration relay)


Remove the No. 2 integration relay (AIR PMP HTR).


b.

Measure the voltage according to the value(s) in the table below.

Standard Voltage:
Tester Connection Condition Specified Condition
1X-1 - Body ground Always 11 to 14 V



c.

Reinstall the No. 2 integration relay (AIR PMP HTR).



OK

3.CHECK HARNESS AND CONNECTOR (ECM - NO. 2 INTEGRATION RELAY (AIR PMP HTR))

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR (BATTERY - NO. 2INTEGRATION RELAY)

3.CHECK HARNESS AND CONNECTOR (ECM - NO. 2 INTEGRATION RELAY (AIR PMP HTR))
a.

Remove the No. 2 integration relay (AIR PMP HTR).


b.

Disconnect the ECM connector.


c.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
for RHD
Tester Connection Condition Specified Condition
1P-10 - C46-60 (HAI1) Always Below 1 Ω
1P-10 or C46-60 (HAI1) - Body ground Always 10 kΩ or higher

for LHD
Tester Connection Condition Specified Condition
1P-10 - C45-60 (HAI1) Always Below 1 Ω
1P-10 or C45-60 (HAI1) - Body ground Always 10 kΩ or higher



d.

Reinstall the No. 2 integration relay (AIR PMP HTR).


e.

Reconnect the ECM connector.



OK

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR