Home › Engine / Hybrid System › 3UR-FE (EMISSION CONTROL) › AIR INJECTION DRIVER (w/ Secondary Air Injection System) › from 2017.08
RM2660E _51 Engine / Hybrid System _052787 3UR-FE EMISSION CONTROL _0327530 AIR INJECTION DRIVER(w/ Secondary Air Injection System) A

3UR-FE EMISSION CONTROL  AIR INJECTION DRIVER(w/ Secondary Air Injection System)  INSTALLATION  


PROCEDURE

Hide 1.INSTALL AIR INJECTION CONTROL DRIVER ASSEMBLY

a.

Install the air injection control driver assembly with the 3 bolts.

Torque:
8.0 N*m (82 kgf*cm, 71 in.*lbf)


b.

Connect the 4 air injection control driver connectors.


c.

Connect the wire harness clamp.


d.

Connect the ground wire with the bolt.

Torque:
8.0 N*m (82 kgf*cm, 71 in.*lbf)


Hide 2.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:

When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See page General>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION)