|
N*m (kgf*cm, ft.*lbf): Specified torque | - | - |
This procedure includes the installation of small-head bolts. Refer to Small-Head Bolts of Basic Repair Hint to identify the small-head bolts.
Click hereGeneral>INTRODUCTION>REPAIR INSTRUCTION>PRECAUTION
19500 2.INSTALL IGNITION COIL ASSEMBLY
| *A | for Bank 1 | *B | for Bank 2 |
Install the 6 ignition coil assemblies with the 6 bolts.
If an ignition coil assembly has been struck or dropped, replace it.
Connect the 6 ignition coil assembly connectors.
3.INSTALL BRACKET
17650G 4.CONNECT PURGE VSV (DUTY VACUUM SWITCHING VALVE)
12266B 5.CONNECT NO. 1 VENTILATION PRESSURE SENSOR HOSE
16288 6.CONNECT NO. 4 WATER BY-PASS PIPE
82121 7.CONNECT ENGINE WIRE
11209 8.INSTALL V-BANK COVER SUB-ASSEMBLY
9.PERFORM INITIALIZATION
Perform "Inspection After Repair" after replacing an ignition coil assembly or spark plug.
Click hereEngine / Hybrid System>V35A-FTS (ENGINE CONTROL)>SFI SYSTEM>INITIALIZATION