| Procedure | Part Name Code |
|
|
|
|
|---|---|---|---|---|---|
| 1 | PCV VALVE (VENTILATION VALVE SUB-ASSEMBLY) | 12204 | ( ) |
- | - |
| 2 | VENTILATION HOSE | 12261 | - | - | - |
| 3 | NO. 2 FUEL DELIVERY PIPE SUB-ASSEMBLY LH | 23808B | - | - | - |
|
N*m (kgf*cm, ft.*lbf): Specified torque | * | For use with ball joint lock nut wrench |
12204 1.INSTALL PCV VALVE (VENTILATION VALVE SUB-ASSEMBLY)
| *a | Torque Wrench Fulcrum Length | - | - |
|
Apply Engine Oil | - | - |
Apply a light coat of engine oil to the O-ring.
When reusing the PCV valve (ventilation valve sub-assembly), inspect the O-ring.
Using a ball joint lock nut wrench (22 mm), install the PCV valve (ventilation valve sub-assembly) to the No. 1 PCV case.
5.0 N*m (51 kgf*cm, 44 in.*lbf)
Calculate the torque wrench reading when changing the fulcrum length of the torque wrench.
Click hereGeneral>INTRODUCTION>REPAIR INSTRUCTION>PRECAUTION
When using a ball joint lock nut wrench (fulcrum length of 150 mm (5.91 in.)) + torque wrench (fulcrum length of 185 mm (7.28 in.)): 2.8 N*m (29 kgf*cm, 25 in.*lbf)
12261 2.INSTALL VENTILATION HOSE
| *a | 45° | *b | Upper Side |
Connect the ventilation hose to the PCV valve (ventilation valve sub-assembly), and slide the clip to secure hose.
Align the hose and the hose clip at the locations shown in the illustration and install them.
23808B 3.INSTALL NO. 2 FUEL DELIVERY PIPE SUB-ASSEMBLY LH