Home › Engine / Hybrid System › 1GR-FE (STARTING) › STARTER › 2014.08–2022.09
RM25T0E _51 Engine / Hybrid System _029357 1GR-FE STARTING _0133495 STARTER A

1GR-FE STARTING  STARTER  INSTALLATION  


PROCEDURE

Hide 11363A 1.INSTALL FLYWHEEL HOUSING SIDE COVER

a.

Install the flywheel housing side cover to the cylinder block.


Hide 28100 2.INSTALL STARTER ASSEMBLY

a.

Install the starter assembly to the cylinder block with the 2 bolts.

Torque:
37 N*m (377 kgf*cm, 27 ft.*lbf)


b.

Install the starter cover to the starter assembly with the 3 bolts.

Torque:
11.5 N*m (117 kgf*cm, 8 ft.*lbf)


c.
A226812E02
1.964,1.018 2.211,1.182 0.247,0.163 10 45°

Connect the starter wire with the nut.

Torque:
9.8 N*m (100 kgf*cm, 87 in.*lbf)

HINT:

The direction of starter wire is indicated in the illustration.



d.

Connect the terminal cap.


e.

Connect the starter connector.


f.

Connect the ground wire to the cylinder block with the bolt.

Torque:
12.6 N*m (128 kgf*cm, 9 ft.*lbf)


Hide 17105 3.INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY LH

Hide 4.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL