Home › Power Source / Network › 1VD-FTV (BATTERY / CHARGING) › GENERATOR › 2014.08–2022.09
RM25T0E _57 Power Source / Network _029610 1VD-FTV BATTERY / CHARGING _0134070 GENERATOR A

1VD-FTV BATTERY / CHARGING  GENERATOR  INSTALLATION  


PROCEDURE

Hide 27020 1.INSTALL GENERATOR ASSEMBLY

a.

Set the generator assembly with the 2 stud bolts.


b.

Using an E7 "TORX" socket wrench, tighten the 2 stud bolts.

Torque:
6.0 N*m (61 kgf*cm, 53 in.*lbf)


c.
A163035N02
2.479,0.521 2.656,0.719 0.177,0.198 10 true 1 0.875,1.5 1.042,1.729 0.167,0.229 10 true 2 0.906,0.5 1.083,0.698 0.177,0.198 10 true 4 1.729,0.625 1.906,0.823 0.177,0.198 10 true 5 2.604,1.531 2.781,1.729 0.177,0.198 10 true 3

Install the generator assembly with the 2 nuts and 3 bolts in the order shown in the illustration.

Torque:
21 N*m (214 kgf*cm, 15 ft.*lbf)


d.

Connect the generator connector.


e.

Connect the generator wire with the nut.

Torque:
9.8 N*m (100 kgf*cm, 87 in.*lbf)


f.

Install the terminal cap.


Hide 27280 2.INSTALL GENERATOR SPLASH GUARD COVER ASSEMBLY

a.

Install the generator splash guard cover assembly with the 3 bolts.

Torque:
8.0 N*m (82 kgf*cm, 71 in.*lbf)

HINT:

Temporarily install all of the bolts, and then tighten the bolts to the specified torque.



b.

Connect the wire harness clamp to the generator splash guard cover assembly.


Hide 16361A 3.INSTALL FAN AND GENERATOR V BELT

Hide 51442 4.INSTALL NO. 2 ENGINE UNDER COVER

Hide 28800 5.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL