Home › Engine / Hybrid System › 1VD-FTV (ENGINE CONTROL) › ECM › from 2017.01
RM25T0E _51 Engine / Hybrid System _029760 1VD-FTV ENGINE CONTROL _0135352 ECM A

1VD-FTV ENGINE CONTROL  ECM  INSTALLATION  


PROCEDURE

Hide 89661 1.INSTALL ECM

a.

Clean the ECM seal's surface with non-residue solvent.


b.

Attach a new gasket to the ECM.


c.

Install the ECM with the 4 bolts.

Torque:
8.0 N*m (82 kgf*cm, 71 in.*lbf)


d.

Connect the 2 connectors and push each lock lever down to lock the connectors.

A388455C01
0.042,0.042 0.333,0.25 0.292,0.208 12 false *A 3.594,0.052 3.906,0.25 0.313,0.198 12 false *B 0.896,0.813 1.167,1.031 0.271,0.219 10 false 90° 0.885,1.74 1.156,1.958 0.271,0.219 10 false 90° 4.594,1.76 4.865,1.979 0.271,0.219 10 false 90° 4.604,0.792 4.875,1.01 0.271,0.219 10 false 90°
*A for LHD *B for RHD


NOTICE:
·

Make sure that the lock levers are raised 90° before connecting the connectors. Failure to do this may cause the lock levers and terminals to break.

·

Do not twist the wire harness when connecting the connectors.




Hide 2.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Hide 5.INITIALIZE LEARNED VALUE OF SUPPLY PUMP ASSEMBLY