Home › Power Source / Network › NETWORKING › NETWORK GATEWAY ECU › from 2022.09
RM25T0E _57 Power Source / Network _057931 NETWORKING _0548835 NETWORK GATEWAY ECU A

NETWORKING  NETWORK GATEWAY ECU  INSTALLATION  


PROCEDURE

Hide 55433B 1.INSTALL LOWER NO. 2 INSTRUMENT PANEL FINISH PANEL

Hide 55550 2.INSTALL GLOVE COMPARTMENT DOOR ASSEMBLY

Hide 3.INSTALL NETWORK GATEWAY ECU

a.
B649993C01
0,0 0,0 false
V100135

Bolt
V100136

Connector


Attach the hook temporarily install the network gateway ECU.


b.

Install the network gateway ECU with the bolt.

Torque:
8.0 N*m (82 kgf*cm, 71 in.*lbf)


c.

Connect the connector.


Hide 4.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Hide 5. INITIALIZATION AFTER RECONNECTING BATTERY TERMINAL

HINT:

When disconnecting and reconnecting the battery, there is an automatic learning function that completes learning when the respective system is used.

Click hereGeneral>SETUP>WHEN DISCONNECTING OR RECONNECTING BATTERY TERMINAL>AUTOMATIC LEARNING CHART