| *1 | FC STACK CASE PLUG COVER | *2 | FC STACK CASE |
|
N*m (kgf*cm, ft.*lbf): Specified torque | ● | Non-reusable part |
1A456
1.INSTALL FC STACK WATER OUTLET
| *a | Protrusion (Gasket Side) | - | - |
Install a new gasket to the FC stack water outlet.
Install the FC stack water outlet with the 4 bolts.
1A4A1
2.INSTALL FC STACK AIR AND WATER INLET
| *a | Protrusion (Gasket Side) | - | - |
Install a new gasket to the FC stack air and water inlet.
Install the FC stack air and water inlet with the 6 bolts.
1A4A2
3.INSTALL FC STACK AIR OUTLET
| *a | Protrusion (Gasket Side) | - | - |
Install a new gasket to the FC stack air outlet.
Install the FC stack air outlet with the 3 bolts.
1A461
4.INSTALL FC STACK HYDROGEN INLET
Install a new gasket to the FC stack hydrogen inlet.
Install the FC stack hydrogen inlet with the 2 bolts.
1A19AA
5.INSTALL NO. 2 FC STACK CASE PLUG
| *a | Ensure 6 mm (0.236 in.) or more | - | - |
Remove the peeling paper from a new No. 2 FC stack case plug and install the plug to the FC stack.
Install within 60 minutes of removing the peeling paper.
Clean and degrease the installation surface of the No. 2 FC stack case plug.
Ensure 6 mm or more along the entire circumference for the adhesive width of the plug and seal surface.
Install the FC stack case plug cover with the 2 bolts.
1A191
6.INSTALL FC STACK VENTILATION COVER
| *a | Protrusion (Gasket Side) | - | - |
Install a new gasket to the FC stack ventilation cover.
Install the FC stack ventilation cover with the 3 bolts.
1A654
7.INSTALL FC STACK MONITOR WIRE BRACKET
1A631
8.INSTALL FC STACK MONITOR WIRE
1A647
9.INSTALL FC STACK WIRING HARNESS PROTECTOR
1A671
10.INSTALL FC STACK VOLTAGE SENSOR
| *a | Connectors on FC Stack Side | - | - |
Temporarily install the 3 bolts.
The FC stack voltage sensor is not self-supported. Temporarily install while supporting the FC stack voltage sensor.
Tighten the 3 bolts in the order shown in the illustration, and install the FC stack voltage sensor.
Connect the 10 connectors to the FC stack voltage sensor.
Check that the connectors on the FC stack side are not lifted.
Temporarily install the 2 nuts.
Tighten the 2 nuts in the order shown in the illustration, and install the FC stack wire harness protector.
Check that the connectors on the cell side are not lifted.
If they are lifted, connect the connector deeply.
G9A51
11.INSTALL FC CONVERTER SHEET
| *a | Peeling Paper | *b | Marking |
| *c | Double-sided Tape | - | - |
Remove the peeling paper on a new FC converter sheet while making sure not to touch the adhesional surface.
Attach the FC converter sheet to the FC stack voltage sensor as shown in the illustration.
Check that there is no foreign matter or other substances that could affect adhesiveness on the double-sided tape application surface.
Attach the FC converter sheet within the marking area of the FC stack voltage sensor as shown in the illustration.
Check that there is no foreign matter or other substances that could affect adhesiveness on the double-sided tape application surface.