ECM > INSTALLATION |
| 1. INSTALL ECM |
![]() |
Install the No. 3 ECM bracket with the 2 screws.
![]() |
Install the 2 No. 2 ECM brackets with the 4 screws.
![]() |
Install the 3 No. 1 ECM brackets with the 6 screws.
![]() |
Install the ECM with the 2 nuts.
![]() |
Install the ECM with bracket with the 2 nuts and bolt.
![]() |
Connect the 4 hybrid vehicle control ECU connectors.
Connect the 4 ECM connectors.
| 2. INSTALL NO. 3 HEATER TO REGISTER DUCT |
Install the clip and then the duct with the No. 2 side defroster nozzle duct.
| 3. INSTALL INSTRUMENT PANEL SUB-ASSEMBLY |
Install the instrument panel (Click here).
| 4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
| 5. PERFORM INITIALIZATION |
Perform initialization (Click here).