Home › ENGINE › 1NZ-FXE ENGINE CONTROL SYSTEM › ECM

ECM > INSTALLATION

for Preparation Click here



1. INSTALL ECM


    A087478E01
  1. Install the No. 3 ECM bracket with the 2 screws.



    A087477E01
  1. Install the 2 No. 2 ECM brackets with the 4 screws.



    A087476E01
  1. Install the 3 No. 1 ECM brackets with the 6 screws.



    A087475E01
  1. Install the ECM with the 2 nuts.

    Torque:
    3.0 N*m{ 31 kgf*cm , 27 in.*lbf }



    A087535E01
  1. Install the ECM with bracket with the 2 nuts and bolt.

    Torque:
    3.0 N*m{ 31 kgf*cm , 27 in.*lbf }



    A087532E01
  1. Connect the 4 hybrid vehicle control ECU connectors.

  1. Connect the 4 ECM connectors.



2. INSTALL NO. 3 HEATER TO REGISTER DUCT
  1. Install the clip and then the duct with the No. 2 side defroster nozzle duct.



3. INSTALL INSTRUMENT PANEL SUB-ASSEMBLY
  1. Install the instrument panel (Click here).



4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL


5. PERFORM INITIALIZATION
  1. Perform initialization (Click here).

    NOTICE:
    Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.