With the quarter panel removed.
*1: When welding 2 panels together including 980 MPa ultra high strength steel.
| Spot weld | Pressure | 2940 N (300 kgf, 661 lbf) |
| Weld current | 10000 A | |
| Weld time | 18 Cyc. (0.30 Sec.) | |
| Plug weld | Plug diameter | 10 mm (0.39 in.) |
| Wire type | AWS A5.18 ER70S-3 | |
| Shield gas | Metal active gas |
*2: When welding more than 3 panels together including 980 MPa ultra high strength steel. (When plug welding a third panel to 2 panels which are welded under the conditions described above.)
| Plug weld | Plug diameter | Same as the standard method (See the introduction) |
| Wire type | AWS A5.18 ER70S-3 | |
| Shield gas | Metal active gas |
Be sure to use Metal active gas (Ar 80% + CO2 20%) as the shield gas when plug welding. Sufficient weld strength cannot be assured when using 100% CO2 shield gas.
REMOVAL
| Symbol meaning | |
|---|---|
|
Remove Weld Points |
|
Remove Weld Points |
|
Cut and Join Location |
|
Cut Location for Supply Parts |
Do not butt weld or heat repair because the heat decreases the strength of areas where ultra high strength steel is used. (See the introduction)
INSTALLATION
| Symbol meaning | |
|---|---|
|
Spot Weld |
|
Plug Weld |
|
Plug Weld |
|
Cut and Join Location |
|
Fillet Weld |
|
Butt Weld |
Inspect the fitting of the related parts around the new parts before welding. This affects the appearance of the finish.
Temporarily install the new parts and measure each part of the new parts in accordance with the body dimension diagram. (See the body dimensions)
If the entire supply part is not needed, remove the part of the supply part that is needed.
Follow the welding conditions when welding *1 and *2 to assure sufficient weld strength. (See the introduction)
Before temporarily installing the new parts, weld the rocker reinforce sub-assembly outer, center body pillar reinforcement sub-assembly and center body pillar inner with the standard number of welding points.
After welding the rocker reinforce sub-assembly outer, center body pillar reinforcement sub-assembly and center body pillar inner to the vehicle side, install the front body pillar upper outer and rocker panel outer.
After welding, apply body sealer and undercoating to the corresponding parts. (See the painting / coating)
After applying the top coat, apply anti-rust agent to the internal panel portion of the closed section structural weld points.