Home › Engine / Hybrid System › 1NZ-FXE EMISSION CONTROL › PCV VALVE › 2011.12–2014.12
RM2170E _51 Engine / Hybrid System _057007 1NZ-FXE EMISSION CONTROL _0277963 PCV VALVE A

1NZ-FXE EMISSION CONTROL  PCV VALVE  INSTALLATION  


PROCEDURE

Hide 12204 1.INSTALL VENTILATION VALVE SUB-ASSEMBLY

a.

Apply adhesive to 2 or 3 threads of the ventilation valve sub-assembly.

Adhesive:

Toyota genuine adhesive 1324, three bond 1324 or equivalent



b.

Using a ball joint lock nut wrench (19 mm), install the ventilation valve sub-assembly.

Torque:
27 N*m (275 kgf*cm, 20 ft.*lbf)

NOTICE:

Use the torque value compensation formula to calculate the torque value for use when a torque wrench is combined with a tool such as a ball joint lock nut wrench (See page General>INTRODUCTION>REPAIR INSTRUCTION>PRECAUTION).



c.

Install the No. 1 ventilation hose.


d.

Install the wire harness with the 2 bolts.

Torque:
9.0 N*m (92 kgf*cm, 80 in.*lbf)