Use the same procedure for the RH and LH sides.
The procedure described below is for the LH side.
75561
1.INSTALL NO. 1 ROOF DRIP SIDE FINISH MOULDING CLIP
When installing new clips, remove the double-sided tape remaining where the clips will be installed on the body and clean the body with a non-residue solvent.
Apply a 2 to 3 mm (0.0787 to 0.118 in.) bead of adhesive (3M DP-105 or equivalent) to new roof drip side finish moulding clips.
Adhesive strength (tensile strength): 13.7 MPa (140.0 kgf/cm2) or more (when the temperature is 23°C (73°F))
Press and install the 2 roof drip side finish moulding clips.
Install 2 new clips to the positions on the roof panel shown in the illustration. Determine the locations and firmly press and install the 2 roof drip side finish moulding clips after lightly applying adhesive (3M DP-105 or equivalent).
| Dimension | Measurement |
|---|---|
| a | 2.0 mm (0.0787 in.) |
| b | 3.4 mm (0.134 in.) |
| c | 3.0 mm (0.118 in.) |
| d | 2.0 mm (0.0787 in.) |
| e | 4.9 mm (0.193 in.) |
| f | 4.0 mm (0.157 in.) |
Install the roof drip center side finish moulding when 20 minutes or more have elapsed after pressing and installing 2 new roof drip side finish moulding clips.
Initial hardening time: 20 minutes
Complete hardening time: 48 hours
75552
2.INSTALL ROOF DRIP SIDE FINISH MOULDING
Engage the 2 clips and install the roof drip side finish moulding.