Home › Engine / Hybrid System › 1NZ-FXE EMISSION CONTROL › CANISTER(w/ Canister Pump Module) › from 2017.06
RM2170E _51 Engine / Hybrid System _057007 1NZ-FXE EMISSION CONTROL _0320446 CANISTER(w/ Canister Pump Module) A

1NZ-FXE EMISSION CONTROL  CANISTER(w/ Canister Pump Module)  INSTALLATION  


PROCEDURE

Hide 77740R 1.INSTALL LEAK DETECTION PUMP SUB-ASSEMBLY

HINT:

Only perform this procedure when replacement of the leak detection pump sub-assembly is necessary.


a.
A267661

Engage the 2 claws to install a new leak detection pump sub-assembly to the No. 1 charcoal canister filter.

NOTICE:
·

Do not allow foreign matter such as grease, oil or water to adhere to the O-rings.

·

Ensure that the claws are engaged properly.




Hide 77745 2.INSTALL NO. 1 CHARCOAL CANISTER FILTER

a.

Push the vent hose onto the canister (charcoal canister assembly) and push in the retainer to engage the lock claws.

NOTICE:
·

Check that there are no scratches or foreign matter around the connecting parts of the tube connector and pipe (canister (charcoal canister assembly)) before performing this work.

·

After connecting the vent hose, check that the vent hose is securely connected by pulling on the tube connector.




Hide 77765 3.INSTALL CHARCOAL CANISTER PROTECTOR

a.

Install the charcoal canister protector with the clip.


Hide 77752 4.INSTALL CHARCOAL CANISTER SUPPORT BRACKET

a.

Install the charcoal canister support bracket with the 2 bolts.

Torque:
5.4 N*m (55 kgf*cm, 48 in.*lbf)


b.

Engage the clamp to connect the vent hose.


Hide 77751 5.INSTALL CHARCOAL CANISTER BASE BRACKET

a.

Install the charcoal canister base bracket with the 4 bolts.

Torque:
5.4 N*m (55 kgf*cm, 48 in.*lbf)


b.

Engage the clamp to connect the vent hose.


Hide 77740 6.INSTALL CANISTER (CHARCOAL CANISTER ASSEMBLY)

a.

Install the canister (charcoal canister assembly) with the 3 bolts.

Torque:
19 N*m (194 kgf*cm, 14 ft.*lbf)


b.

Push the vent line tube onto the canister (charcoal canister assembly) and push in the retainer to engage the lock claws.

NOTICE:
·

Check that there are no scratches or foreign matter around the connecting parts of the tube connector and pipe (canister (charcoal canister assembly)) before performing this work.

·

After connecting the vent line tube, check that the vent line tube is securely connected by pulling on the tube connector.




c.

Connect the purge line hose to the canister (charcoal canister assembly) and slide the clip to secure it.


d.

Push the air line tube onto the canister (charcoal canister assembly) and push in the retainer to engage the lock claws.

NOTICE:
·

Check that there are no scratches or foreign matter around the connecting parts of the tube connector and pipe (canister (charcoal canister assembly)) before performing this work.

·

After connecting the air line tube, check that the air line tube is securely connected by pulling on the tube connector.




e.

Connect the leak detection pump sub-assembly connector.