Home › Engine / Hybrid System › 2ZR-FXE (ENGINE CONTROL) › THROTTLE BODY › 2012.03–2012.10
RM2070E _51 Engine / Hybrid System _061905 2ZR-FXE ENGINE CONTROL _0301562 THROTTLE BODY A

2ZR-FXE ENGINE CONTROL  THROTTLE BODY  REMOVAL  


PROCEDURE

Hide 17705 3.REMOVE AIR CLEANER CAP SUB-ASSEMBLY

a.
A212311

Disconnect the mass air flow meter connector.


b.
U190525

Release the 2 clamps.


c.

Loosen the hose clamp and remove the air cleaner cap sub-assembly.


Hide 5.REMOVE AIR CLEANER CASE

a.

Remove the air cleaner filter element sub-assembly.


b.
A212314

Separate the water hose from the 3 clamps.


c.

Remove the 3 bolts and air cleaner case.


Hide 6.REMOVE AIR CLEANER HOSE ASSEMBLY

a.
A212315

Loosen the hose clamp and separate the ventilation hose.


b.

Unlock the hose clamp and remove the air cleaner hose assembly.


Hide 22210 7.REMOVE THROTTLE BODY ASSEMBLY

a.
A247948

Disconnect the throttle body connector and 2 water by-pass hoses.


b.

Remove the 2 bolts, 2 nuts and throttle body assembly.


c.
A212317

Remove the gasket from the intake manifold.