Refer to the description for DTC P0AE6-225 (See page Engine / Hybrid System>HYBRID / BATTERY CONTROL>HYBRID CONTROL SYSTEM>P0AE6-225).
| DTC No. | INF Code | DTC Detection Condition | Trouble Area |
|---|---|---|---|
| P0AE0 | 228 | Open or +B short in SMRG circuit | ·
Wire harness or connector ·
Hybrid battery junction block assembly ·
Power management control ECU |
Refer to the wiring diagram for DTC P0AE6-225 (See page Engine / Hybrid System>HYBRID / BATTERY CONTROL>HYBRID CONTROL SYSTEM>P0AE6-225).
Before inspecting the high-voltage system or disconnecting the low voltage connector of the inverter with converter assembly, take safety precautions such as wearing insulated gloves and removing the service plug grip to prevent electrical shocks. After removing the service plug grip, put it in your pocket to prevent other technicians from accidentally reconnecting it while you are working on the high-voltage system.
After removing the service plug grip, wait for at least 10 minutes before touching any of the high-voltage connectors or terminals. After waiting for 10 minutes, check the voltage at the terminals in the inspection point in the inverter with converter assembly. The voltage should be 0 V before beginning work (See page Engine / Hybrid System>HYBRID / BATTERY CONTROL>HYBRID CONTROL SYSTEM>PRECAUTION).
Waiting for at least 10 minutes is required to discharge the high-voltage capacitor inside the inverter with converter assembly.
After turning the power switch off, waiting time may be required before disconnecting the cable from the negative (-) auxiliary battery terminal. Therefore, make sure to read the disconnecting the cable from the negative (-) auxiliary battery terminal notices before proceeding with work (See page General>INTRODUCTION>REPAIR INSTRUCTION>PRECAUTION).
If P0AE0-228 is stored, the vehicle cannot be started.
After the repair, clear the DTCs, perform the following procedure and check that the same DTC (including pending DTC) is not output.
Turn the power switch off and wait for 30 seconds or more.
Turn the power switch on (READY) and wait for 30 seconds or more.
Turn the power switch off and wait for 60 seconds or more.
Connect the GTS to the DLC3.
Turn the power switch on (IG).
Enter the following menus: Powertrain / Hybrid Control / Data List / SMRG Status.
Read the Data List.
| Tester Display | Condition | Specified Condition |
|---|---|---|
| SMRG Status | Power switch on (IG) | OFF |
Turn the power switch off.
OK
NG
OK
NG
OK
NG
Turn the power switch on (IG).
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| L5-2 (SMRG) - Body ground | Power switch on (IG) | Below 1 V |
| *a | Component with harness connected
(Power Management Control ECU) |
Turn the power switch off.
OK
NG
OK
NG
Disconnect the L5 power management control ECU connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| L5-2 (SMRG) - Body ground | Power switch off | 19.0 to 35.5 Ω |
| *a | Rear view of wire harness connector
(to Power Management Control ECU) |
Reconnect the L5 power management control ECU connector.
OK
NG
Be sure to wear insulated gloves.
Check that the service plug grip is not installed.
After removing the service plug grip, do not turn the power switch on (READY), unless instructed by the repair manual because this may cause a malfunction.
Remove the IGCT NO. 2 and AM2 fuses from the engine room relay block and junction block assembly.
| *1 | Engine Room Relay Block and Junction Block Assembly |
| *2 | AM2 Fuse |
| *3 | IGCT NO. 2 Fuse |
Remove the No. 2 hybrid battery shield sub-assembly (See page Engine / Hybrid System>HYBRID / BATTERY CONTROL>HV RELAY ASSEMBLY>REMOVAL).
Disconnect the c6 hybrid battery junction block assembly connector.
Disconnect the A21, A22, L5 and L6 power management control ECU connectors.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| L5-2 (SMRG) - A21-2 (+B2) | Power switch off | 10 kΩ or higher |
| L5-2 (SMRG) - A22-5 (+B1) | Power switch off | 10 kΩ or higher |
| L5-2 (SMRG) - L5-1 (AM22) | Power switch off | 10 kΩ or higher |
| L5-2 (SMRG) - L6-7 (AM21) | Power switch off | 10 kΩ or higher |
| L5-2 (SMRG) - A22-6 (MREL) | Power switch off | 10 kΩ or higher |
| L5-2 (SMRG) - A22-1 (IG2) | Power switch off | 10 kΩ or higher |
| L5-2 (SMRG) - L6-1 (ACCD) | Power switch off | 10 kΩ or higher |
| L5-2 (SMRG) - L6-2 (IG1D) | Power switch off | 10 kΩ or higher |
| L5-2 (SMRG) - A22-2 (IG2D) | Power switch off | 10 kΩ or higher |
| L5-2 (SMRG) - L5-14 (SPDI) | Power switch off | 10 kΩ or higher |
| L5-2 (SMRG) - A21-16 (GI) | Power switch off | 10 kΩ or higher |
| L5-2 (SMRG) - A21-4 (FCTL) | Power switch off | 10 kΩ or higher |
| *a | Rear view of wire harness connector
(to Power Management Control ECU) |
Reconnect the A21, A22, L5 and L6 power management control ECU connectors.
Reconnect the c6 hybrid battery junction block assembly connector.
Install the No. 2 hybrid battery shield sub-assembly.
Install the IGCT NO. 2 and AM2 fuses.
OK
NG
Be sure to wear insulated gloves.
Check that the service plug grip is not installed.
After removing the service plug grip, do not turn the power switch on (READY), unless instructed by the repair manual because this may cause a malfunction.
Remove the No. 2 hybrid battery shield sub-assembly (See page Engine / Hybrid System>HYBRID / BATTERY CONTROL>HV RELAY ASSEMBLY>REMOVAL).
Disconnect the c6 hybrid battery junction block assembly connector.
Disconnect the L5 power management control ECU connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| L5-2 (SMRG) - c6-1 (SMRG) | Power switch off | Below 1 Ω |
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| L5-2 (SMRG) and c6-1 (SMRG) - Body ground and other terminals | Power switch off | 10 kΩ or higher |
| *a | Rear view of wire harness connector
(to Power Management Control ECU) |
| *b | Rear view of wire harness connector
(to Hybrid Battery Junction Block Assembly) |
Reconnect the L5 power management control ECU connector.
Reconnect the c6 hybrid battery junction block assembly connector.
Install the No. 2 hybrid battery shield sub-assembly.
OK
NG
Be sure to wear insulated gloves.
Check that the service plug grip is not installed.
After removing the service plug grip, do not turn the power switch on (READY), unless instructed by the repair manual because this may cause a malfunction.
Remove the No. 2 hybrid battery shield sub-assembly (See page Engine / Hybrid System>HYBRID / BATTERY CONTROL>HV RELAY ASSEMBLY>REMOVAL).
Disconnect the c6 hybrid battery junction block assembly connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| c6-2 (GND) - Body ground | Power switch off | Below 1 Ω |
| *a | Rear view of wire harness connector
(to Hybrid Battery Junction Block Assembly) |
Reconnect the c6 hybrid battery junction block assembly connector.
Install the No. 2 hybrid battery shield sub-assembly.
OK
NG
Be sure to wear insulated gloves.
Check that the service plug grip is not installed.
After removing the service plug grip, do not turn the power switch on (READY), unless instructed by the repair manual because this may cause a malfunction.
Remove the hybrid battery junction block assembly (See page Engine / Hybrid System>HYBRID / BATTERY CONTROL>HV RELAY ASSEMBLY>COMPONENTS).
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| c6-1 (SMRG) - c6-2 (GND) | -40 to 80 °C (-40 to 176°F) | 19.0 to 35.5 Ω |
| *a | Component without harness connected
(Hybrid Battery Junction Block Assembly) |
Install the hybrid battery junction block assembly.
OK
NG