Home › Engine / Hybrid System › 2ZR-FXE (INTAKE / EXHAUST) › INTAKE MANIFOLD › from 2012.10
RM2070E _51 Engine / Hybrid System _061910 2ZR-FXE INTAKE / EXHAUST _0301617 INTAKE MANIFOLD A

2ZR-FXE INTAKE / EXHAUST  INTAKE MANIFOLD  INSTALLATION  


PROCEDURE

Hide 17111 1.INSTALL INTAKE MANIFOLD

a.

w/ Stud Bolt:

i.

Using an E6 "TORX" socket wrench, install the 2 stud bolts to the intake manifold.

Torque:
5.0 N*m (51 kgf*cm, 44 in.*lbf)

HINT:

If a stud bolt is deformed or the threads are damaged, replace the stud bolt.




b.

Install a new No. 1 intake manifold to head gasket to the intake manifold.


c.
A212684

Install the intake manifold with the 2 bolts and 2 nuts.

Torque:
28 N*m (286 kgf*cm, 21 ft.*lbf)


d.
A212683

Connect the fuel vapor feed hose and ventilation hose to the intake manifold.


e.

Apply a light coat of engine oil to a new O-ring.


f.

Install the O-ring to the engine oil level dipstick guide sub-assembly.


g.
A212681E06
1.396,0.24 1.521,0.385 0.125,0.146 10 true A 2.083,0.917 2.208,1.063 0.125,0.146 10 true B

Install the engine oil level dipstick guide sub-assembly with the 2 bolts and connect the wire harness clamp.

Torque:
Bolt (A) : 28 N*m (286 kgf*cm, 21 ft.*lbf)
Bolt (B) : 21 N*m (214 kgf*cm, 15 ft.*lbf)


h.

Install the engine oil level dipstick.


i.
A212682

Connect the 2 wire harness clamps and 3 connectors.


Hide 89421 3.INSTALL MANIFOLD ABSOLUTE PRESSURE SENSOR

Hide 22210 5.INSTALL THROTTLE BODY ASSEMBLY