Home › Power Source / Network › NETWORKING › CAN COMMUNICATION SYSTEM (w/o Central Gateway ECU) › 2012.03–2014.11
RM2070E _57 Power Source / Network _061936 NETWORKING _0301754 CAN COMMUNICATION SYSTEM(w/o Central Gateway ECU) J

NETWORKING  CAN COMMUNICATION SYSTEM(w/o Central Gateway ECU)  Open in CAN Main Bus Line (LHD Models)  


DESCRIPTION

There may be an open circuit in one of the V bus main lines and/or a DLC3 branch line when the resistance between terminals 6 (CANH) and 14 (CANL) of the DLC3 is 70 Ω or higher.

Symptom Trouble Area
Resistance between terminals 6 (CANH) and 14 (CANL) of DLC3 is 70 Ω or higher.
·

DLC3 branch line or connector

·

CAN main bus line or connector

·

ECM

·

Meter circuit plate

·

CAN No. 1 junction connector

·

CAN No. 2 junction connector

·

CAN No. 3 junction connector



This malfunction is not related to the lines of a CAN main bus branch or to ECUs or sensor connected a CAN main bus branch.

WIRING DIAGRAM

C240426E21
4.719,0.906 5.219,1.198 0.5,0.292 10 false ECM 0.833,8 2.729,8.229 1.896,0.229 10 false : CAN Main Bus Line (CANH) 0.833,8.396 2.729,8.625 1.896,0.229 10 false : CAN Main Bus Line (CANL) 4.167,7.979 5.885,8.208 1.719,0.229 10 false : CAN Branch Line (CANH) 4.177,8.385 5.896,8.615 1.719,0.229 10 false : CAN Branch Line (CANL) 4.688,6.76 5.896,7.458 1.208,0.698 10 false Meter Circuit Plate 3.823,1.24 4.229,1.417 0.406,0.177 10 false CANH 2.5,1.229 2.885,1.406 0.385,0.177 10 false CANL 2.51,6.563 2.958,6.813 0.448,0.25 10 false CANL 5.365,3.781 5.854,3.958 0.49,0.177 10 false CANH 3.802,6.563 4.313,6.844 0.51,0.281 10 false CANH 5.49,4.031 5.927,4.229 0.438,0.198 10 false CANL 2.823,2.781 3.198,2.958 0.375,0.177 10 false L132 2.844,1.896 3.177,2.094 0.333,0.198 10 false A67 2.865,3.49 3.167,3.667 0.302,0.177 10 false L94 2.865,4.365 3.167,4.542 0.302,0.177 10 false L94 3.625,3.479 3.927,3.656 0.302,0.177 10 false L94 3.615,4.365 3.917,4.542 0.302,0.177 10 false L94 4.302,3.792 4.604,3.969 0.302,0.177 10 false L95 4.302,4.042 4.604,4.219 0.302,0.177 10 false L95 3.594,1.906 3.854,2.083 0.26,0.177 10 false A67 5.906,4.375 6.344,4.604 0.438,0.229 10 false DLC3 5.615,4.375 5.906,4.552 0.292,0.177 10 false L61 4.375,6.771 4.667,6.948 0.292,0.177 10 false L27 0.479,2.271 2.427,2.469 1.948,0.198 10 false CAN No. 1 Junction Connector 3.948,1.469 4.115,1.646 0.167,0.177 10 false 13 4.333,3.583 4.521,3.76 0.188,0.177 10 false 14 4.344,4.24 4.51,4.417 0.167,0.177 10 false 15 5.177,4.229 5.344,4.406 0.167,0.177 10 false 14 2.646,3.469 2.802,3.646 0.156,0.177 10 false 4 3.969,3.469 4.135,3.646 0.167,0.177 10 false 5 2.708,4.854 2.927,5.094 0.219,0.24 10 false 11 3.833,4.854 4,5.031 0.167,0.177 10 false 5 3.938,1.896 4.125,2.083 0.188,0.188 10 false 1 2.646,1.896 2.813,2.073 0.167,0.177 10 false 7 2.583,2.781 2.792,2.958 0.208,0.177 10 false 12 3.969,2.781 4.156,2.99 0.188,0.208 10 false 6 2.646,4.354 2.854,4.531 0.208,0.177 10 false 1 3.99,4.365 4.208,4.542 0.219,0.177 10 false 2 2.719,6.302 2.938,6.479 0.219,0.177 10 false 20 3.833,6.313 4.073,6.49 0.24,0.177 10 false 19 3.198,7.104 3.677,7.313 0.479,0.208 10 false 120 Ω 3.167,0.646 3.635,0.885 0.469,0.24 10 false 120 Ω 5.135,3.604 5.292,3.781 0.156,0.177 10 false 6 2.729,1.635 2.885,1.813 0.156,0.177 10 false V 3.833,1.635 3.99,1.813 0.156,0.177 10 false P 3.854,6.042 4.083,6.219 0.229,0.177 10 false SB 2.708,3.135 2.865,3.313 0.156,0.177 10 false W 4.833,3.604 4.99,3.781 0.156,0.177 10 false B 3.854,3.135 4.01,3.313 0.156,0.177 10 false B 4.854,4.229 5.01,4.406 0.156,0.177 10 false W 2.74,6.042 2.896,6.219 0.156,0.177 10 false G 0.76,0.792 1.99,1.052 1.229,0.26 10 false x: Suspected Area 2.656,1.469 2.802,1.646 0.146,0.177 10 false 5 3.573,2.781 3.917,2.958 0.344,0.177 10 false L132 2.719,4.635 2.969,4.823 0.25,0.188 10 false W 3.802,4.635 4.083,4.833 0.281,0.198 10 false GR 0.698,5.24 1.073,5.417 0.375,0.177 10 false L133 2.698,5.771 2.917,5.948 0.219,0.177 10 false 12 3.854,5.771 4.021,5.948 0.167,0.177 10 false 6 0.479,3.823 2.458,4.26 1.979,0.438 10 false CAN No. 2 Junction Connector 1.083,5.24 2.333,5.698 1.25,0.458 10 false CAN No. 3 Junction Connector 4.354,0.906 4.646,1.083 0.292,0.177 10 false A57

CAUTION / NOTICE / HINT

NOTICE:
·

Before measuring the resistance of the CAN bus, turn the power switch off and leave the vehicle for 1 minute or more without operating the key, switches or opening or closing the doors. After that, disconnect the cable from the negative (-) auxiliary battery terminal and leave the vehicle for 1 minute or more before measuring the resistance.

·

After turning the power switch off, waiting time may be required before disconnecting the cable from the negative (-) auxiliary battery terminal. Therefore, make sure to read the disconnecting the cable from the negative (-) auxiliary battery terminal notices before proceeding with work (See page General>INTRODUCTION>REPAIR INSTRUCTION>PRECAUTION).

·

Because the order of diagnosis is important to allow correct diagnosis, make sure to begin troubleshooting using How to Proceed with Troubleshooting when CAN communication system related DTCs are output (See page Power Source / Network>NETWORKING>CAN COMMUNICATION SYSTEM (w/o Central Gateway ECU)>HOW TO PROCEED WITH TROUBLESHOOTING).

·

After performing repairs, perform the DTC check procedure and confirm that the DTCs are not output again.

·

DTC check procedure: Turn the power switch on (IG), turn the cruise control system on using the cruise control switch (ON/OFF switch), wait at least 60 seconds, and then drive the vehicle at a speed of 50 km/h (31 mph) or more for at least 1.72 seconds.

·

After the repair, perform CAN Bus Check and check that all the ECUs and sensors connected to the CAN communication system are displayed (See page Power Source / Network>NETWORKING>CAN COMMUNICATION SYSTEM (w/o Central Gateway ECU)>DIAGNOSIS SYSTEM).



HINT:
·

Operating the power switch, any other switches or a door triggers related ECU and sensor communication on the CAN. This communication will cause the resistance value to change.

·

Even after DTCs are cleared, if a DTC is stored again after driving the vehicle for a while, the malfunction may be occurring due to vibration of the vehicle. In such a case, wiggling the ECUs or wire harness while performing the inspection below may help determine the cause of the malfunction.



PROCEDURE

1.CHECK FOR OPEN IN CAN BUS LINES (DLC3 BRANCH LINE)
a.

Disconnect the cable from the negative (-) auxiliary battery terminal.


b.
U154762E01
0.087,0.032 0.927,0.365 0.840,0.334 10 *1 1.587,0.756 1.896,0.938 0.309,0.181 10 L61 2.452,1.066 2.863,1.247 0.411,0.181 10 CANH 2.435,2.911 2.823,3.092 0.387,0.181 10 CANL 2.078,1.828 2.441,1.27 false 2.085,2.535 2.419,2.868 false

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
L61-6 (CANH) - L61-14 (CANL) Cable disconnected from negative (-) auxiliary battery terminal 108 to 132 Ω


Text in Illustration
*1 DLC3

NOTICE:

When the measured value is 133 Ω or higher and a CAN communication system DTC is output, there may be a fault besides disconnection of the DLC3 branch line. For that reason, troubleshooting should be performed again from How to Proceed with Troubleshooting after repairing the trouble area (See page Power Source / Network>NETWORKING>CAN COMMUNICATION SYSTEM (w/o Central Gateway ECU)>HOW TO PROCEED WITH TROUBLESHOOTING).




OK

2.CHECK FOR OPEN IN CAN BUS LINES (ECM)

NG

REPAIR OR REPLACE CAN BRANCH LINE CONNECTED TO DLC3

2.CHECK FOR OPEN IN CAN BUS LINES (ECM)
a.
U154712E01
1.603,0.657 1.906,0.813 0.303,0.156 10 A57 0.178,0.182 0.532,0.455 0.353,0.273 10 *a 2.581,1.039 3.042,1.275 0.461,0.236 10 CANH 2.473,0.795 2.950,1.045 0.477,0.250 10 CANL 1.93,1.677 2.184,0.892 2.184,0.892 2.43,0.892 false 1.958,1.789 2.242,1.117 2.242,1.117 2.533,1.117 false

Disconnect the ECM connector.


b.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
A57-13 (CANH) - A57-5 (CANL) Cable disconnected from negative (-) auxiliary battery terminal 108 to 132 Ω


Text in Illustration
*a Front view of wire harness connector
(to ECM)



OK

NG

3.CHECK FOR OPEN IN CAN BUS LINES (METER CIRCUIT PLATE)
3.CHECK FOR OPEN IN CAN BUS LINES (METER CIRCUIT PLATE)
a.

Reconnect the ECM connector.


b.
U154716E02
2.844,2.469 3.052,2.927 false 2.719,2.469 2.333,2.927 false 0.198,0.156 0.438,0.5 0.24,0.344 10 false *a 2.802,2.948 3.26,3.115 0.458,0.167 10 false CANL 2.125,2.958 2.583,3.125 0.458,0.167 10 false CANH 1.677,0.74 1.99,0.906 0.313,0.167 10 false L27

Disconnect the meter circuit plate connector.


c.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
L27-19 (CANH) - L27-20 (CANL) Cable disconnected from negative (-) auxiliary battery terminal 108 to 132 Ω


Text in Illustration
*a Front view of wire harness connector
(to Meter Circuit Plate)



OK

NG

4.CHECK FOR OPEN IN CAN BUS LINES (CAN NO. 2 J/C)
4.CHECK FOR OPEN IN CAN BUS LINES (CAN NO. 2 J/C)
a.

Reconnect the meter circuit plate connector.


b.
U154776E03
0.99,1.354 1.083,1.354 1.083,1.354 1.552,1.667 false 2.51,1.354 2.042,1.354 2.042,1.354 1.729,1.656 false 1.552,1.865 1.063,2.073 1.063,2.073 0.979,2.073 false 1.75,1.875 1.958,2.063 1.958,2.063 2.521,2.063 false 0.146,0.094 0.698,0.458 0.552,0.365 10 false *a 0.385,1.26 1,1.469 0.615,0.208 10 false CANL*b 2.573,1.271 3.167,1.521 0.594,0.25 10 false CANH*b 1.615,0.615 2.063,0.875 0.448,0.26 10 false L94 0.396,1.969 0.979,2.198 0.583,0.229 10 false CANL*c 2.594,1.969 3.156,2.146 0.563,0.177 10 false CANH*c

Disconnect the wire harness connector from the CAN No. 2 junction connector (instrument panel connector holder left side).


c.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition Connected to
L94-2 (CANH) -L94-1 (CANL) Cable disconnected from negative (-) auxiliary battery terminal 108 to 132 Ω CAN No. 3 junction connector
L94-5 (CANH) - L94-4 (CANL) Cable disconnected from negative (-) auxiliary battery terminal 108 to 132 Ω CAN No. 1 junction connector


Text in Illustration
*a Front view of wire harness connector
(to CAN No. 2 Junction Connector)
*b to CAN No. 3 Junction Connector
*c to CAN No. 1 Junction Connector

Result:
Result Proceed to
OK A
NG (CAN No. 1 junction connector main line) B
NG (CAN No. 3 junction connector main line) C




A

REPLACE CAN NO. 2 JUNCTION CONNECTOR

B

5.CHECK FOR OPEN IN CAN BUS LINES (CAN NO. 2 J/C - CAN NO. 1 J/C)

C

7.CHECK FOR OPEN IN CAN BUS LINES (CAN NO. 3 J/C)
5.CHECK FOR OPEN IN CAN BUS LINES (CAN NO. 2 J/C - CAN NO. 1 J/C)
a.

Reconnect the wire harness connector to the CAN No. 2 junction connector (instrument panel connector holder left side).


b.
U154807E02
2.135,1.75 2.135,0.979 2.135,0.979 2.479,0.979 false 2.125,2.063 2.125,2.542 2.125,2.542 2.49,2.542 false 0.135,0.094 0.396,0.313 0.26,0.219 10 false *a 1.552,0.698 1.969,0.906 0.417,0.208 10 false L132 2.531,0.896 3.198,1.219 0.667,0.323 10 false CANH*b 2.542,2.438 3.208,2.76 0.667,0.323 10 false CANL*b

Disconnect the wire harness connector from the CAN No. 1 junction connector (instrument panel wire side).


c.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
L132-6 (CANH) - L132-12 (CANL) Cable disconnected from negative (-) auxiliary battery terminal 108 to 132 Ω


Text in Illustration
*a Front view of wire harness connector
(to CAN No. 1 Junction Connector)
*b to CAN No. 2 Junction Connector



OK

6.CHECK FOR OPEN IN CAN BUS LINES (CAN NO. 1 J/C - ECM)

NG

REPAIR OR REPLACE CAN MAIN BUS LINE OR CONNECTOR (CAN NO. 1 J/C - CAN NO. 2 J/C)

6.CHECK FOR OPEN IN CAN BUS LINES (CAN NO. 1 J/C - ECM)
a.
U154808E03
1.25,1.74 1.25,0.969 1.25,0.969 0.917,0.969 false 1.25,2.104 1.25,2.583 1.25,2.583 0.896,2.583 false 0.156,0.146 0.417,0.365 0.26,0.219 10 false *a 1.594,0.781 2.01,0.99 0.417,0.208 10 false A67 0.323,0.875 0.99,1.198 0.667,0.323 10 false CANH*b 0.323,2.49 0.99,2.813 0.667,0.323 10 false CANL*b

Disconnect the wire harness connector from the CAN No. 1 junction connector (engine room main wire side).


b.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
A67-1 (CANH) - A67-7 (CANL) Cable disconnected from negative (-) auxiliary battery terminal 108 to 132 Ω


Text in Illustration
*a Front view of wire harness connector
(to CAN No. 1 Junction Connector)
*b to ECM



OK

REPLACE CAN NO. 1 JUNCTION CONNECTOR

NG

REPAIR OR REPLACE CAN MAIN BUS LINE OR CONNECTOR (CAN NO. 1 J/C - ECM)

7.CHECK FOR OPEN IN CAN BUS LINES (CAN NO. 3 J/C)
a.

Reconnect the wire harness connector to the CAN No. 2 junction connector (instrument panel connector holder left side).


b.
U154809E02
1.969,1.75 1.969,0.844 1.969,0.844 2.313,0.844 false 1.958,2.083 1.958,2.74 1.958,2.74 2.313,2.74 false 2.125,1.729 2.125,1.104 2.125,1.104 2.458,1.104 false 2.135,2.083 2.135,2.49 2.135,2.49 2.49,2.49 false 0.115,0.104 0.406,0.354 0.292,0.25 10 false *a 1.531,0.521 1.948,0.729 0.417,0.208 10 false L133 2.365,0.76 3.031,0.958 0.667,0.198 10 false CANH*b 2.365,2.656 3.031,2.979 0.667,0.323 10 false CANL*b 2.531,1.021 3.104,1.219 0.573,0.198 10 false CANH*c 2.531,2.396 3.083,2.563 0.552,0.167 10 false CANL*c

Disconnect the wire harness connector from the CAN No. 3 junction connector (instrument panel wire side).


c.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition Connected to
L133-5 (CANH) -L133-11 (CANL) Cable disconnected from negative (-) auxiliary battery terminal 108 to 132 Ω CAN No. 2 junction connector
L133-6 (CANH) - L133-12 (CANL) Cable disconnected from negative (-) auxiliary battery terminal 108 to 132 Ω Meter circuit plate


Text in Illustration
*a Front view of wire harness connector
(to CAN No. 3 Junction Connector)
*b to CAN No. 2 Junction Connector
*c to Meter Circuit Plate

Result:
Result Proceed to
OK A
NG (CAN No. 2 junction connector main line) B
NG (Meter circuit plate main line) C




A

REPLACE CAN NO. 3 JUNCTION CONNECTOR

B

REPAIR OR REPLACE CAN MAIN BUS LINE OR CONNECTOR (CAN NO. 2 J/C - CAN NO. 3 J/C)

C

REPAIR OR REPLACE CAN MAIN BUS LINE OR CONNECTOR (CAN NO. 3 J/C - METER CIRCUIT PLATE)