Home › Vehicle Exterior › LIGHTING (EXT) › LIGHTING SYSTEM

LIGHTING SYSTEM > Front Fog Light Circuit

for Preparation Click here


DESCRIPTION

The main body ECU (multiplex network body ECU) controls the front fog lights via the FR FOG relay in the instrument panel junction block assembly.

WIRING DIAGRAM


E233299E01


INSPECTION PROCEDURE

NOTICE:
Inspect the fuses and bulbs for circuits related to this system before performing the following inspection procedure.

1.CHECK OPERATION (TAILLIGHTS AND HEADLIGHTS)
  1. Check the operation of the taillights and headlights.

    OK:
    Taillights and headlights operate normally.



NG
GO TO PROBLEM SYMPTOMS TABLE (Click here)
OK


2.PERFORM ACTIVE TEST USING TECHSTREAM
  1. Connect the Techstream to the DLC3.

  1. Turn the ignition switch to ON (IG).

  1. Turn the Techstream on.

  1. Enter the following menus: Body Electrical / Main Body / Active Test.

  1. Check that the relay operates.

    Main Body 
    Tester Display
    Test Part
    Control Range
    Diagnostic Note
    Front Fog Light Relay
    Front fog light relay
    ON/OFF
    Light control switch is in head position

    OK:
    Front fog light relay operates. (Front fog lights come on.)



NG
Go to step 3
OK

PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE (Click here)  

3.INSPECT INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY
  1. Remove the instrument panel junction block assembly (Click here).



    E182509E15
  1. Remove the main body ECU (multiplex network body ECU) from the instrument panel junction block assembly.

  1. Connect a positive (+) lead from the auxiliary battery to terminal 3E-1.

  1. Connect a negative (-) lead from the auxiliary battery to terminal MB-14 (TRLY) and MB-13 (FFGO).

  1. Measure the voltage according to the value(s) in the table below.

    Standard Voltage:
    Tester Connection
    Condition
    Specified Condition
    3C-7 - Body ground
    Always
    11 to 14 V

    Text in Illustration 
    *a
    Component without harness connected
    (Instrument Panel Junction Block Assembly)



NG
REPLACE INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY (Click here)
OK


4.CHECK HARNESS AND CONNECTOR (FOG LIGHT ASSEMBLY - INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY AND BODY GROUND)
  1. Disconnect the A12 fog light assembly LH connector.

  1. Disconnect the A63 fog light assembly RH connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    A12-2 - 3C-7
    Always
    Below 1 Ω
    A63-2 - 3C-7
    Always
    Below 1 Ω
    3C-7 - Body ground
    Always
    10 kΩ or higher



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK

REPLACE MAIN BODY ECU (MULTIPLEX NETWORK BODY ECU) (Click here)