Home › Vehicle Interior › METER / GAUGE / DISPLAY › LIGHT CONTROL RHEOSTAT

LIGHT CONTROL RHEOSTAT > INSTALLATION

for Preparation Click here



1. INSTALL LIGHT CONTROL RHEOSTAT
  1. Engage the 2 claws to install the light control rheostat.



2. INSTALL NO. 1 SWITCH HOLE BASE
  1. Connect each connector.



    B307670
  1. Engage the 4 claws and 2 clips to install the No. 1 switch hole base.



3. INSTALL UPPER INSTRUMENT PANEL ASSEMBLY
(Click here)