LIGHT CONTROL RHEOSTAT > INSTALLATION |
| 1. INSTALL LIGHT CONTROL RHEOSTAT |
Engage the 2 claws to install the light control rheostat.
| 2. INSTALL NO. 1 SWITCH HOLE BASE |
Connect each connector.
![]() |
Engage the 4 claws and 2 clips to install the No. 1 switch hole base.
| 3. INSTALL UPPER INSTRUMENT PANEL ASSEMBLY |