Home › Audio / Visual / Telematics › NAVIGATION / MULTI INFO DISPLAY › NAVIGATION SYSTEM (for DVD)

NAVIGATION SYSTEM (for DVD) > Reverse Signal Circuit

for Preparation Click here


DESCRIPTION

The navigation receiver assembly receives a reverse signal from the power management control ECU via the integration relay to use for adjusting the vehicle position on the navigation display.

WIRING DIAGRAM


E187099E01


INSPECTION PROCEDURE

1.INSPECT NAVIGATION RECEIVER ASSEMBLY


    E168562E32
  1. Disconnect the L42 navigation receiver assembly connector.

  1. Measure the voltage according to the value(s) in the table below.

    Standard Voltage:
    Tester Connection
    Condition
    Specified Condition
    L42-5 (REV) - Body ground
    Power switch on (IG)
    Shift lever in R
    11 to 14 V
    L42-5 (REV) - Body ground
    Power switch on (IG)
    Shift lever in any position except R
    Below 1 V

Text in Illustration 
*1
Front view of wire harness connector
(to Navigation Receiver Assembly)


NG
Go to step 2
OK

PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE (Click here)  

2.CHECK HARNESS AND CONNECTOR (NAVIGATION RECEIVER ASSEMBLY - INTEGRATION RELAY)


    E168562E32
  1. Disconnect the L42 navigation receiver assembly connector.



    E187129E01
  1. Disconnect the 1G integration relay connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    L42-5 (REV) - 1G-4 (NAV)
    Always
    Below 1 Ω
    L42-5 (REV) - Body ground
    Always
    10 kΩ or higher

Text in Illustration 
*1
Front view of wire harness connector
(to Navigation Receiver Assembly)
*2
Front view of wire harness connector
(to Integration Relay)


NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK


3.INSPECT INTEGRATION NO.1 RELAY


    E187129E02
  1. Disconnect the 1G integration relay connector.

  1. Measure the voltage according to the value(s) in the table below.

    Standard Voltage:
    Tester Connection
    Condition
    Specified Condition
    1G-13 (BKUP) - Body ground
    Power switch on (IG)
    Shift lever in R
    11 to 14 V
    1G-13 (BKUP) - Body ground
    Power switch on (IG)
    Shift lever in any position except R
    Below 1 V

Text in Illustration 
*1
Front view of wire harness connector
(to Integration Relay)


NG
Go to step 4
OK

REPLACE INTEGRATION NO.1 RELAY (Click here)  

4.CHECK HARNESS AND CONNECTOR (INTEGRATION RELAY - POWER MANAGEMENT CONTROL ECU)


    E187129E02
  1. Disconnect the 1G integration relay connector.



    E187130E01
  1. Disconnect the A21 power management control ECU connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    1G-13 (BKUP) - A21-15 (BL)
    Always
    Below 1 Ω
    1G-13 (BKUP) - Body ground
    Always
    10 kΩ or higher

Text in Illustration 
*1
Front view of wire harness connector
(to Integration Relay)
*2
Front view of wire harness connector
(to Power Management Control ECU)


NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK

REPLACE POWER MANAGEMENT CONTROL ECU (Click here)