INSTALLATION
Removal / installation · Vehicles built Nov 2005 – Dec 2006
Versions by build date: Nov 2005 – Dec 2006 from Jan 2007
| 1.
INSTALL STARTER ASSEMBLY |
 |
- Install the starter with the 2 bolts.
-
Torque:
- 64 N*m{
652 kgf*cm
, 47 ft.*lbf
}
- Install the terminal nut and cover the nut with the cap.
-
Torque:
- 9.8 N*m{
100 kgf*cm
, 7 ft.*lbf
}
- Connect the starter connector.
| 2.
INSTALL NO. 3 AIR HOSE
|
 |
- Install the No. 3 air hose to the No. 2 air tube and throttle body.
Tighten the 2 hose clamps.
-
Torque:
- 6.3 N*m{
64 kgf*cm
, 56 in.*lbf
}
| 3.
INSTALL NO. 1 AIR TUBE |
 |
- Install the air tube with the 2 bolts.
-
Torque:
- 29 N*m{
296 kgf*cm
, 21 ft.*lbf
}
Tighten the 2 clamps.
-
Torque:
- 6.3 N*m{
64 kgf*cm
, 56 in.*lbf
}
- Install the wire harness with the 2 bolts.
-
Torque:
- 7.5 N*m{
76 kgf*cm
, 66 in.*lbf
}
| 4.
INSTALL AIR CLEANER BRACKET |
 |
- Install the bracket with the 3 bolts.
-
Torque:
- 7.5 N*m{
76 kgf*cm
, 66 ft.*lbf
}
Connect the 2 fuel hoses to the bracket.
Attach the 2 wire harness clamps.
- Install the glow plug relay and connect the fuel filter level switch connector.
| 5.
INSTALL FUEL FILTER ASSEMBLY |
 |
- Install the fuel filter with the bolt.
-
Torque:
- 7.0 N*m{
71 kgf*cm
, 62 ft.*lbf
}
| 6.
INSTALL AIR CLEANER CASE |
 |
- Install the cleaner case with the 3 bolts and connect the wire harness clamp.
-
Torque:
- 5.0 N*m{
51 kgf*cm
, 44 in.*lbf
}
Install the air cleaner element.
| 7.
INSTALL AIR CLEANER CAP |
 |
- Insert the hinge parts of the air cleaner cap into the air cleaner case, and then hang the 3 hook clamps.
Connect the mass air flow meter connector.
Engage the wire harness clamp.
| 8.
INSTALL BATTERY BRACKET REINFORCEMENT |
 |
- Install the bracket reinforcement with the 2 bolts.
-
Torque:
- 19 N*m{
194 kgf*cm
, 14 ft.*lbf
}
| 9.
INSTALL FRONT BATTERY BRACKET |
 |
- Install the bracket front with the 4 bolts.
-
Torque:
- 19 N*m{
194 kgf*cm
, 14 ft.*lbf
}
Attach the 2 wire harness clamps.
| 11.
INSTALL BATTERY INSULATOR |
|
| 12.
INSTALL BATTERY CLAMP |
 |
- Attach the hook of the battery clamp to the battery bracket front.
Temporarily tighten the nut and install the bolt.
Adjust the battery clamp's position.
Fully tighten the nut and bolt.
-
Torque:
- 5.0 N*m{
51 kgf*cm
, 44 in.*lbf
}
Attach the 2 wire harness clamps.
| 13.
CONNECT CABLE TO POSITIVE BATTERY TERMINAL |
|
| 14.
INSTALL NO. 1 ENGINE UNDER COVER
|
 |
Install the engine under cover with the 12 clips and 4 bolts.
| 15.
INSTALL RADIATOR SUPPORT OPENING COVER |
 |
Install the cover with the 9 clips.
| 16.
INSTALL NO. 1 ENGINE COVER
|
 |
- Attach the 4 clips to install the engine cover.
| 17.
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
|