2005-2008 RAV4 · Service Manual ENGINE

REASSEMBLY

Removal / installation · Vehicles built Nov 2005 – Dec 2006

Versions by build date: Nov 2005 – Dec 2006 from Jan 2007

HINT:
Use high-temperature grease to lubricate the bearings, gears, return spring and steel ball when assembling the starter.


1. INSTALL PLANETARY GEAR
  1. Apply grease to the planetary gears of the planetary shaft.

  1. A087891
    Install the 3 planetary gears.


2. INSTALL STARTER ARMATURE PLATE

  1. A086452
    Insert the plate to the starter center bearing clutch.

  1. Check that the tab of the starter armature plate fits over the groove of the starter center bearing clutch.


3. INSTALL STARTER ARMATURE ASSEMBLY
  1. Install the starter armature to the starter center bearing clutch.

  1. A087885
    Align the tab of the starter center bearing clutch with the notch of the starter yoke, and install the starter yoke.

  1. Install the brush holder.

  1. A030137
    Using a screwdriver, hold the brush spring back and connect the brush into the brush holder.

  1. Connect the 4 brushes.


4. INSTALL STARTER COMMUTATOR END FRAME ASSEMBLY

  1. A086441
    Install the starter commutator end frame with the 2 screws.

    Torque:
    3.8 N*m{ 39 kgf*cm , 33 in.*lbf }


5. INSTALL STARTER DRIVE HOUSING ASSEMBLY
  1. Install the starter pinion drive lever to the starter center bearing clutch.

  1. Install the rubber seal to the starter pinion drive lever.

  1. E110782
    Align the 2 protrusions of the starter center bearing clutch with the 2 cutouts of the starter drive housing, and install the starter center bearing clutch to the starter drive housing.

  1. E110778
    Using a T25 "torx" driver, install the starter drive housing with the 2 bolts.

    Torque:
    6.0 N*m{ 61 kgf*cm , 53 in.*lbf }


6. INSTALL STARTER MAGNETIC SWITCH ASSEMBLY

  1. E110777E01
    Hook the plunger hook on the upper side of the starter pinion drive lever.

  1. Install the spring to the starter magnetic switch.

  1. E110776
    Install the starter magnetic switch with the 3 nuts.

    Torque:
    2.3 N*m{ 23 kgf*cm , 20 in.*lbf }

  1. E110775
    Connect the lead wire to the terminal with the nut.

    Torque:
    5.9 N*m{ 60 kgf*cm , 52 in.*lbf }

← INSPECTION (from Jan 2007)REASSEMBLY (from Jan 2007) →