2005-2008 RAV4 · Service Manual ENGINE

INSTALLATION

Removal / installation · Vehicles built from Nov 2005


1. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY

  1. A090053E01
    Apply a light coat of engine oil to the O-ring of the oil control valve.

  1. A124556
    Install the oil control valve with the bolt.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }

    NOTICE:
    Make sure that the O-ring is not cracked or jammed.

  1. Connect the oil control valve connector.


2. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

3. CHECK FOR ENGINE OIL LEAKS
  1. Start the engine, and check that there are no oil leaks.


4. INSTALL NO. 1 ENGINE COVER

  1. A124558
    Install the cover with the 2 nuts.

    Torque:
    7.0 N*m{ 71 kgf*cm , 62 in.*lbf }

← INSPECTION (from Nov 2005)COMPONENTS (from Nov 2005) →