ECM Power Source Circuit
Circuit diagnosis · Vehicles built from Aug 2007
DESCRIPTION
When the ignition switch is turned ON, the battery voltage is applied to the IGSW of the ECM. The output signal from the MREL terminal of the ECM causes a current to flow to the coil, closing the contacts of the integration relay (EFI MAIN relay) and supplying power to either terminal +B or +B2 of the ECM.WIRING DIAGRAM


INSPECTION PROCEDURE
| 1. INSPECT FUSES (P/I, AM2, IG2, EFI MAIN AND IGN) |
Remove the P/I fuse, AM2 fuse, IG2 fuse and EFI MAIN fuse from the engine room No. 1 relay block.

Remove the IGN fuse from the instrument panel junction block.
Measure the resistance of the fuses.
- Standard resistance:
- Below 1 Ω
Reinstall the fuses.
|
|
||||
| OK | |
| 2. INSPECT RELAY (IG2, EFI MAIN) |
Remove the integration relay and IG2 relay from the engine room No. 1 relay block.

Measure the resistance between the terminals of the integration relay.
- Standard resistance:
Tester Connection
Specified Condition
1C-1 - 1A-4
10 kΩ or higher
Below 1 Ω
(When battery voltage is applied to terminals 1A-2 and 1A-3)
Measure the resistance between the terminals of the IG2 relay.
- Standard resistance:
Tester Connection
Specified Condition
3 - 5
10 kΩ or higher
Below 1 Ω
(When battery voltage is applied to terminals 1 and 2)
Reinstall the IG2 relay.
|
|
||||
| OK | |
| 3. CHECK WIRE HARNESS (ECM - BODY GROUND) |
Disconnect the ECM connector.

Measure the resistance.
- Standard resistance:
Tester Connection
Specified Condition
B96-81 (E1) - Body ground
Below 1 Ω
Reconnect the ECM connector.
|
|
||||
| OK | |
| 4. INSPECT ECM (IGSW VOLTAGE) |
Disconnect the ECM connectors.

Turn the ignition switch to the ON position.
Measure the voltage between the terminals of the ECM connectors.
- Standard voltage:
Tester Connection
Specified Condition
A12-28 (IGSW) - B96-81 (E1)
9 to 14 V
Reconnect the ECM connector.
|
|
||||
| NG | |
| 5. CHECK WIRE HARNESS (RELAY BLOCK, ECM, IGNITION SWITCH, BATTERY) |
Disconnect the ECM connector.

Disconnect the ignition switch connector.
Disconnect the cable from the battery positive terminal.
Remove the AM2 fuse and IG2 relay.
Measure the resistance between the terminals.
- Standard resistance:
Tester Connection
Specified Condition
A12-28 (IGSW) - IG2 relay terminal 5
Below 1 Ω
IG2 relay terminal 2 - Body ground
Below 1 Ω
Positive (+) battery cable - IG2 relay terminal 3
Below 1 Ω
Positive (+) battery cable - AM2 fuse terminal 1
Below 1 Ω
E5-7 (AM2) - AM2 fuse terminal 2
Below 1 Ω
E5-6 (IG2) - IG2 relay terminal 1
Below 1 Ω
A12-28 (IGSW) or IG2 relay terminal 5 - Body ground
10 kΩ or higher
Positive (+) battery cable or AM2 fuse terminal 1 - Body ground
10 kΩ or higher
Positive (+) battery cable or IG2 relay terminal 3 - Body ground
10 kΩ or higher
E5-7 (AM2) or AM2 fuse terminal 2 - Body ground
10 kΩ or higher
E5-6 (IG2) or IG2 relay terminal 1 - Body ground
10 kΩ or higher
Reinstall the relay and fuse.
Reconnect the connectors.
|
|
||||
| OK | |
| 6. INSPECT IGNITION SWITCH |
|
|
||||
| OK | |
| 7. CHECK WIRE HARNESS (INTEGRATION RELAY - ECM, BATTERY AND BODY GROUND) |
Disconnect the ECM connector.

Disconnect the cable from the battery positive terminal.
Remove the integration relay from the engine room No. 1 relay block.
Disconnect the integration relay connector.
Remove the P/I fuse from the engine room No. 1 relay block.
Measure the resistance between the terminals.
- Standard resistance (Check for open):
Tester Connection
Specified Condition
A12-2 (+B) - 1A-4
Below 1 Ω
A12-1 (+B2) - 1A-4
Below 1 Ω
A12-44 (MREL) - 1A-2
Below 1 Ω
P/I fuse terminal 2 - 1C-1
Below 1 Ω
P/I fuse terminal 1 - Positive (+) battery cable
Below 1 Ω
1A-3 - Body ground
Below 1 Ω
A12-2 (+B) or 1A-4 - Body ground
10 kΩ or higher
A12-1 (+B2) or 1A-4 - Body ground
10 kΩ or higher
A12-44 (MREL) or 1A-2 - Body ground
10 kΩ or higher
P/I fuse terminal 2 or 1C-1 - Body ground
10 kΩ or higher
P/I fuse terminal 1 or Positive (+) battery cable - Body ground
10 kΩ or higher
Reconnect the connectors.
Reconnect the cable to the battery positive terminal.
Reinstall the integration relay and P/I fuse.
|
|
||||
| OK | ||
| ||
