PTC Heater Circuit
Circuit diagnosis · Vehicles built from Nov 2005
DESCRIPTION
PTC heater relays are closed in accordance with signals from the air conditioning amplifier and power is supplied to the PTC heater assembly installed on the radiator heater unit.WIRING DIAGRAM


INSPECTION PROCEDURE
| 1. INSPECT FUSE (PTC1, PTC2) |
Remove the PTC1 and PTC2 H-fuses from the engine room No. 2 relay block.
Measure the resistance of the H-fuses.
- Standard resistance:
- Below 1 Ω
|
|
||||
| OK | |
| 2. INSPECT AIR MIX CONTROL KNOB (MAX HOT SWITCH) |
Remove the air mix control knob.

Measure the resistance of the knob.
- Standard resistance:
Tester Connection
Condition
Specified Condition
E29-2 (B) - E29-8 (E)
Max hot position
Below 1 Ω
E29-2 (B) - E29-8 (E)
Other than max hot position
10 kΩ or higher
|
|
||||
| OK | |
| 3. CHECK WIRE HARNESS (AIR MIX CONTROL KNOB - BATTERY) |
Disconnect the E29 control knob connector.

Measure the voltage of the wire harness side connector.
- Standard voltage:
Tester Connection
Condition
Specified Condition
E29-2 (B) - Body ground
Ignition switch on (IG)
10 to 14 V
|
|
||||
| OK | |
| 4. CHECK WIRE HARNESS (AIR MIX CONTROL KNOB - AIR CONDITIONING AMPLIFIER) |
Disconnect the E29 control knob connector.

Disconnect the E43 amplifier connector.
Measure the resistance of the wire harness side connectors.
- Standard resistance:
Tester Connection
Specified Condition
E29-8 (E) - E43-14 (HEAT)
Below 1 Ω
|
|
||||
| OK | |
| 5. INSPECT PTC HEATER RELAY (Marking: PTC NO. 1, PTC NO. 2) |
![]() ![]() |
Remove the No. 1 and No. 2 PTC heater relays from the engine room No. 2 relay block.
Measure the resistance of the relays.
- Standard resistance:
Tester Connection
Specified Condition
3 - 5
10 kΩ or higher
3 - 5
Below 1 Ω
(when battery voltage is applied to terminals 1 and 2)
|
|
||||
| OK | |
| 6. CHECK AIR CONDITIONING AMPLIFIER |
![]() ![]() |
Remove the air conditioning amplifier with its connectors still connected.
Turn the ignition switch on (IG).
When the PTC heater operating conditions are met (engine at idle speed or faster, ambient temperature is 10°C (50°F) or less, engine coolant temperature is 65°C (149°F) or less, air mix control knob setting is MAX HOT), turn the blower switch to the Lo setting.
Measure the voltage of the wire harness side connectors.
- Standard voltage:
Tester Connection
Specified Condition
E43-9 (PTC1) - Body ground
10 to 14 V
E43-10 (PTC2) - Body ground
10 to 14 V
|
|
||||
| OK | |
| 7. CHECK WIRE HARNESS (AIR CONDITIONING AMPLIFIER - PTC HEATER RELAY) |
![]() ![]() |
Remove the No. 1 and No. 2 PTC heater relays from the engine room No. 2 relay block.
Turn the ignition switch on (IG).
When the PTC heater operating conditions are met (engine at idle speed or faster, ambient temperature is 10°C (50°F) or less, engine coolant temperature is 65°C (149°F) or less, air mix control knob setting is MAX HOT), turn the blower switch to the Lo setting.
Measure the voltage of the wire harness side connectors
- Standard voltage:
Tester Connection
Specified Condition
No. 1 PTC heater relay terminal 1 - Body ground
10 to 14 V
No. 2 PTC heater relay terminal 2 - Body ground
10 to 14 V
|
|
||||
| OK | |
| 8. CHECK WIRE HARNESS (PTC HEATER RELAY - BODY GROUND) |
![]() ![]() |
Remove the No. 1 and No. 2 PTC heater relays from the engine room No. 2 relay block.
Measure the resistance of the wire harness side connectors.
- Standard resistance:
Tester Connection
Specified Condition
No. 1 PTC heater relay terminal 2 - Body ground
Below 1 Ω
No. 2 PTC heater relay terminal 1 - Body ground
Below 1 Ω
|
|
||||
| OK | |
| 9. CHECK WIRE HARNESS (PTC HEATER - PTC HEATER RELAY) |
![]() ![]() |
Remove the No. 1 and No. 2 PTC heater relays from the engine room No. 2 relay block.
Measure the resistance of the wire harness side connectors.
- Standard resistance:
Tester Connection
Specified Condition
No. 1 PTC heater relay terminal 3 - A29-3 (B)
Below 1 Ω
No. 2 PTC heater relay terminal 3 - A29-2 (B)
Below 1 Ω
No. 1 PTC heater relay terminal 3 - A29-1 (B)
Below 1 Ω
|
|
||||
| OK | |
| 10. CHECK WIRE HARNESS (BATTERY - PTC HEATER RELAY) |
Remove the No. 1 and No. 2 PTC heater relays from the engine room No. 2 relay block.

Measure the voltage of the wire harness side connectors.
- Standard voltage:
Tester Connection
Specified Condition
No. 1 PTC heater relay terminal 5 - Body ground
10 to 14 V
No. 2 PTC heater relay terminal 5 - Body ground
10 to 14 V
|
|
||||
| OK | |
| 11. CHECK PTC HEATER |
After replacing the PTC heater with a normal one, check that the PTC heater function operates normally.
- OK:
- PTC heater function operates normally.
|
|
||||
| NG | ||
| ||



