INSTALLATION
Removal / installation · Vehicles built from Nov 2005
| 1. INSTALL TRANSMISSION WIRE |
Coat a new O-ring of the transmission wire connector with ATF.

Install the transmission wire.

Install the bolt.
- Torque:
- 5.4 N*m{ 55 kgf*cm , 48 in.*lbf }
Connect the connector.
Coat the O-ring of the ATF temperature sensor with ATF.

Install the ATF temperature sensor with the lock plate and bolt.
- Torque:
- 6.6 N*m{ 67 kgf*cm , 58 in.*lbf }
Connect the 5 shift solenoid valve connectors.
| 2. INSTALL AUTOMATIC TRANSAXLE OIL PAN SUB-ASSEMBLY |
Install the 3 magnets in the oil pan.

Install a new gasket and the oil pan with the 18 bolts.

- Torque:
- 7.6 N*m{ 77 kgf*cm , 67 in.*lbf }
| 3. INSTALL NO. 1 ENGINE UNDER COVER |
| 4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
| 5. ADD AUTOMATIC TRANSAXLE FLUID |
- Fluid type:
- Toyota Genuine ATF WS
| 6. INSPECT TRANSAXLE FLUID LEVEL |
Inspect the fluid level (Click here).
| 7. PERFORM RESET MEMORY |
Perform the RESET MEMORY procedures (A/T initialization) (Click here).
