INSTALLATION
Removal / installation · Vehicles built from Aug 2007
| 1.
INSTALL PARK/NEUTRAL POSITION SWITCH ASSEMBLY |
 |
Install the park/neutral position switch assembly to the manual valve shaft.
Temporarily install the 2 bolts.
- Install a new lock plate and the manual valve shaft nut.
-
Torque:
- 6.9 N*m{
70 kgf*cm
, 61 in.*lbf
}
Temporarily install the control shaft lever.
- Turn the lever counterclockwise until it stops, and then turn it clockwise 2 notches.
Remove the control shaft lever.
- Align the groove and neutral basic line.
Hold the park/neutral position switch assembly in this position and tighten the 2 bolts.
-
Torque:
- 5.4 N*m{
55 kgf*cm
, 48 in.*lbf
}
- Using a screwdriver, stake the nut with the lock washer.
- Install the control shaft lever with the washer and nut.
-
Torque:
- 13 N*m{
133 kgf*cm
, 10 ft.*lbf
}
Connect the shift control cable to the control shaft lever with the nut.
-
Torque:
- 12 N*m{
122 kgf*cm
, 9 ft.*lbf
}
Connect the connector to the park/neutral position switch assembly.
| 2.
INSTALL BATTERY BRACKET REINFORCEMENT
|
 |
- Install the bracket reinforcement with the 2 bolts.
-
Torque:
- 19 N*m{
194 kgf*cm
, 14 ft.*lbf
}
| 3.
INSTALL FRONT BATTERY BRACKET
|
 |
- Install the front battery bracket with the 4 bolts.
-
Torque:
- 19 N*m{
194 kgf*cm
, 14 ft.*lbf
}
Attach the 2 wire harness clamps.
| 5.
INSTALL BATTERY CLAMP SUB-ASSEMBLY
|
 |
Attach the hook of the battery clamp to the front battery bracket.
Temporarily tighten the nut and install the bolt.
Adjust the battery clamp position.
- Fully tighten the nut and bolt.
-
Torque:
- Bolt:
- 17 N*m{
170 kgf*cm
, 12 ft.*lbf
}
- Nut:
- 4.9 N*m{
50 kgf*cm
, 43 in.*lbf
}
Attach the 2 wire harness clamps.
| 6.
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
|
| 7.
ADJUST SHIFT LEVER POSITION |
 |
Adjust the shift lever position (Click here).
| 8.
INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY |
 |
Inspect the switch (Click here).