ECM > INSTALLATION |
| 1. INSTALL ECM |
![]() |
Install the 2 ECM brackets with the 4 screws.
![]() |
Connect the 2 ECM connectors.
Connect the 2 connectors to the ECM and lower the 2 levers.
![]() |
Install the ECM with the 3 bolts.
| 2. INSTALL AIR CLEANER CASE |
![]() |
Attach the clamp and install the air cleaner case with the 3 bolts.
| 3. INSTALL AIR CLEANER FILTER ELEMENT SUB-ASSEMBLY |
| 4. INSTALL AIR CLEANER CAP SUB-ASSEMBLY |
Connect the air cleaner hose.
![]() |
Attach the 3 clips to install the air cleaner cap.
Connect the PCV hose.
Attach the clamp and connect the mass air flow meter connector.
| 5. INSTALL NO. 1 ENGINE COVER |
![]() |
Attach the 4 clips to install the engine cover.
| 6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
| 7. PERFORM REGISTRATION |
Perform learning values write .
w/ Cruise Control System:
When replacing the ECM, perform vehicle stability control system recognition in ECM (Click here).
| 8. PERFORM INITIALIZATION |
Perform the supply pump initialization procedure (Click here)
| 9. PERFORM THROTTLE VALVE FULLY CLOSED POSITION LEARNING |
Turn the ignition switch to ON.
Turn the ignition switch off and wait 10 seconds.