POWER STEERING ECU (for LHD) > INSTALLATION |
| 1. INSTALL POWER STEERING ECU |
![]() |
Check that the connector lever is at the fully unlocked position before installation.
![]() |
Install the ECU with the 3 nuts.
Connect the 4 connectors.
Lock the connector lever.
Lightly pull on the connector and check that the connector will not be disconnected.
| 2. INSTALL UPPER INSTRUMENT PANEL |
Install the upper instrument panel (Click here).
| 3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |