Home › HEATER & AIR CONDITIONING SYSTEM › AIR CONDITIONING › AIR CONDITIONING PANEL (for Manual Air Conditioning System)

AIR CONDITIONING PANEL (for Manual Air Conditioning System) > INSTALLATION

for Preparation Click here



1. INSTALL AIR VENT MODE CONTROL SWITCH
  1. Attach the 2 claws to install the mode control switch.



2. INSTALL BLOWER CONTROL SWITCH
  1. Attach the 2 claws to install the blower control switch.



3. INSTALL AIR MIX CONTROL SWITCH
  1. Attach the 2 claws to install the air mix control switch.



4. INSTALL AIR CONDITIONING CONTROL ASSEMBLY


    E118688
  1. Connect the connectors.

  1. Attach the 3 clips to install the air conditioning control.

  1. Install the 2 screws.



5. INSTALL NAVIGATION RECEIVER ASSEMBLY WITH BRACKET (w/ Navigation System)
  1. for DVD:
    Install the navigation receiver assembly with bracket .

  1. for HDD:
    Install the navigation receiver assembly with bracket .



6. INSTALL STEREO OPENING COVER (w/o Radio Receiver)


B133002
  1. Attach the 4 clips to install the stereo opening cover.

  1. Install the 4 bolts.



7. INSTALL RADIO RECEIVER ASSEMBLY (w/ Radio Receiver)
  1. for 3ZR-FAE
    Install the radio receiver assembly with bracket .

  1. for 3ZR-FAE
    Install the radio receiver assembly with bracket .



8. INSTALL NO. 1 INSTRUMENT CLUSTER FINISH PANEL CENTER


B210523
  1. Connect the connector.

  1. Attach the 3 clips and 2 claws to install the cluster finish panel.



9. INSTALL NO. 2 INSTRUMENT CLUSTER FINISH PANEL CENTER


B210524
  1. Connect the connector.

  1. Attach the 3 clips and 2 claws to install the cluster finish panel.



10. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL


11. CHECK SRS WARNING LIGHT
  1. Check the SRS warning light (Click here).