Home › Engine / Hybrid System › 2AD-FTV ENGINE CONTROL › ECM
RM3090E _51 Engine / Hybrid System _008377 2AD-FTV ENGINE CONTROL _0046796 ECM A

2AD-FTV ENGINE CONTROL  ECM  INSTALLATION  


PROCEDURE

Hide 89661 1.INSTALL ECM

a.

Install the No. 1 ECM bracket and No. 2 ECM bracket to the ECM with the 4 screws.

Torque:
3.0 N*m (31 kgf*cm, 27 in.*lbf)


b.

Install the ECM with bracket with the 3 bolts.

Torque:
6.5 N*m (66 kgf*cm, 58 in.*lbf)


c.

Connect the 2 ECM connectors and lower the 2 levers.

NOTICE:
·

When connecting the ECM connector, make sure that dirt, water or other foreign matter is not stuck between the ECM connector and ECM.

·

Make sure that the 2 levers are securely lowered.




Hide 17801 3.INSTALL AIR CLEANER FILTER ELEMENT SUB-ASSEMBLY

Hide 17705 4.INSTALL AIR CLEANER CAP SUB-ASSEMBLY

Hide 6.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:

When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

Click hereGeneral>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION


Hide 9.PERFORM THROTTLE VALVE FULLY CLOSED POSITION LEARNING