Home › Power Source / Network › 2AD-FTV BATTERY / CHARGING › GENERATOR
RM3090E _57 Power Source / Network _008780 2AD-FTV BATTERY / CHARGING _0049603 GENERATOR A

2AD-FTV BATTERY / CHARGING  GENERATOR  INSTALLATION  


PROCEDURE

Hide 27020 1.INSTALL GENERATOR ASSEMBLY

a.

Install the generator assembly with the 3 bolts.

Torque:
25 N*m (255 kgf*cm, 18 ft.*lbf)

NOTICE:

Be careful that the wire harness of the crankshaft position sensor does not get caught between the cylinder block and generator when installing the generator assembly.



b.

Install the wire harness clamp bracket with the bolt.

Torque:
7.7 N*m (79 kgf*cm, 68 in.*lbf)


c.

Install the wire harness to terminal B with the nut.

Torque:
9.8 N*m (100 kgf*cm, 87 in.*lbf)


d.

Install the terminal cap.


e.

Connect the generator connector and attach the wire harness clamp.


Hide 2.INSTALL WIRE HARNESS CLAMP BRACKET (for DPF)

a.

Install the wire harness clamp bracket with the bolt.

Torque:
13 N*m (127 kgf*cm, 9 ft.*lbf)


b.

Attach the wire harness clamp and connect the air fuel ratio sensor connector.


Hide 16361A 4.INSTALL FAN AND GENERATOR V BELT

Hide 6.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:

When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

Click hereGeneral>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION