Home › Power Source / Network › 1AD-FTV BATTERY / CHARGING › GENERATOR › 2012.12–2015.10
RM3090E _57 Power Source / Network _008779 1AD-FTV BATTERY / CHARGING _0049700 GENERATOR A

1AD-FTV BATTERY / CHARGING  GENERATOR  INSTALLATION  


PROCEDURE

Hide 27020 1.INSTALL GENERATOR ASSEMBLY

a.

Install the generator assembly with the 3 bolts.

Torque:
25 N*m (255 kgf*cm, 18 ft.*lbf)

NOTICE:

Be careful that the wire harness of the crankshaft position sensor does not get caught between the cylinder block and generator when installing the generator.



b.

Connect the connector to the generator assembly.


c.

Connect the wire harness to terminal B with the nut.

Torque:
9.8 N*m (100 kgf*cm, 87 in.*lbf)


d.

Install the terminal cap.


e.

Connect the wire harness to the generator assembly with the bolt.

Torque:
7.7 N*m (79 kgf*cm, 68 in.*lbf)


Hide 2.INSTALL WIRE HARNESS CLAMP BRACKET

a.

Install the wire harness clamp bracket with the bolt.

Torque:
13 N*m (133 kgf*cm, 10 ft.*lbf)


b.

Attach the wire harness clamp and connect the sensor connector.


Hide 16361A 4.INSTALL FAN AND GENERATOR V BELT

Hide 28800 6.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:

When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

Click hereGeneral>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION