Home › Engine / Hybrid System › HYBRID / BATTERY CONTROL › BATTERY VOLTAGE SENSOR (for NICKEL METAL HYDRIDE BATTERY)
RM3620E _51 Engine / Hybrid System _076333 HYBRID / BATTERY CONTROL _0371634 BATTERY VOLTAGE SENSOR(for NICKEL METAL HYDRIDE BATTERY) A

HYBRID / BATTERY CONTROL  BATTERY VOLTAGE SENSOR(for NICKEL METAL HYDRIDE BATTERY)  INSTALLATION  


PROCEDURE

Hide 89892A 1.INSTALL BATTERY VOLTAGE SENSOR

CAUTION:

Be sure to wear insulated gloves and protective goggles.


a.
A430738C01
2.281,2.156 2.042,2.156 2.042,2.156 1.427,1.385 true 1,2.719 1.771,2.719 true 2.344,2.063 2.656,2.26 0.313,0.198 10 false *a 1.854,2.625 2.167,2.823 0.313,0.198 10 false *b
*a Blue Label
*b Pin


Install the battery voltage sensor to the HV battery with the bolt.

Torque:
7.5 N*m (76 kgf*cm, 66 in.*lbf)

NOTICE:
·

Check the color of the label.

·

If the battery voltage sensor has been struck or dropped, replace it.

·

Make sure to align the hole of the battery voltage sensor with the pin.




b.

Connect the battery voltage sensor connector.

NOTICE:

Make sure that the connector is connected securely.



Hide G92Q1 2.INSTALL NO. 1 HV BATTERY SHIELD PANEL

CAUTION:

Be sure to wear insulated gloves and protective goggles.


a.

Pull back the rear No. 1 HV battery shield and install the No. 1 HV battery shield panel to the HV battery.


b.

Install the bolt and nut.

Torque:
7.5 N*m (76 kgf*cm, 66 in.*lbf)


c.

Connect the battery voltage sensor connector.


d.

Engage the clamp.


Hide G920NB 3.INSTALL UPPER HV BATTERY COVER SUB-ASSEMBLY

CAUTION:

Be sure to wear insulated gloves and protective goggles.


a.

Install the upper HV battery cover sub-assembly to the HV battery with the 8 bolts and 4 nuts.

Torque:
7.5 N*m (76 kgf*cm, 66 in.*lbf)