The fuel pump (for low pressure side) circuit consists of the ECM, fuel pump (for low pressure side) and fuel pump control ECU (which operates the fuel pump (for low pressure side)). Based on the engine output, the ECM determines the fuel pump speed. The speed is then converted to a duty signal and sent to the fuel pump control ECU. Based on the signal sent from the ECM, the fuel pump control ECU adjusts the fuel pump (for low pressure side) operation speed.
Inspect the fuses for circuits related to this system before performing the following procedure.
| *1 | Fuel Pump Control ECU | - | - |
Remove the fuel pump control ECU.
Click hereEngine / Hybrid System>A25B-FXS (FUEL)>FUEL PUMP ECU>REMOVAL
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| N15-1 (+B) - N15-3 (GND) | Always | 10 Ω or higher |
| N15-1 (+B) - N15-2 (FPC) | Always | 2 kΩ or higher |
| N15-2 (FPC) - N15-3 (GND) | Always | 1 kΩ or higher |
| N14-1 (FPG) - N15-3 (GND) | Always | Below 1 kΩ |
| N14-2 (FPU) - N15-3 (GND) | Always | 2 kΩ or higher |
| N14-3 (FPV) - N15-3 (GND) | Always | 2 kΩ or higher |
| N14-4 (FPW) - N15-3 (GND) | Always | 2 kΩ or higher |
This procedure checks for an internal short of the fuel pump control ECU when its transistor is stuck on.
| Proceed to |
|---|
| OK |
| NG |
OK
NG
| *a | Front view of wire harness connector
(to Fuel Pump Control ECU) |
Disconnect the fuel pump control ECU connector.
Turn the power switch on (IG).
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| N15-1 (+B) - N15-3 (GND) | Power switch on (IG) | 11 to 14 V |
Make a note of the measured voltage as it may be used in a following Active Test.
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Disconnect the fuel pump control ECU connector.
Disconnect the ECM connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| N15-2 (FPC) - A24-6 (FPC) | Always | Below 1 Ω |
| N15-2 (FPC) or A24-6 (FPC) - Body ground and other terminals | Always | 10 kΩ or higher |
| Proceed to |
|---|
| OK |
| NG |
OK
NG
| *1 | Fuel Pump Control ECU | - | - |
Disconnect the N14 fuel pump control ECU connector.
Connect the GTS to the DLC3.
Turn the power switch on (IG).
Turn the GTS on.
Enter the following menus: Powertrain / Engine / Active Test / Fuel Pump Single Phase Energization.
| Tester Display |
|---|
| Fuel Pump Single Phase Energization |
Operate the fuel pump control ECU using the Active Test function and measure the voltage according to the value(s) in the table below.
| Tester Connection | GTS Operation | Specified Condition |
|---|---|---|
| N14-2 (FPU) - Body ground | U Phase | 4.4 to 8.4 V* |
| N14-3 (FPV) - Body ground | V Phase | 4.4 to 8.4 V* |
| N14-4 (FPW) - Body ground | W Phase | 4.4 to 8.4 V* |
*: This Active Test restricts the fuel pump control ECU output duty cycle to 50%. Therefore, the output voltage of the fuel pump control ECU will be approximately 50% of the power source voltage measured in a previous step.
Before performing this inspection, check that the auxiliary battery voltage is between 11 and 14 V (not depleted).
| Result | Proceed to |
|---|---|
| The U phase, V phase and W phase are all normal | A |
| The U phase, V phase or W phase is abnormal | B |
| The U phase, V phase and W phase are all abnormal | C |
A
B
C
Disconnect the fuel pump control ECU connector.
Disconnect the fuel pump (for low pressure side) connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| N14-2 (FPU) - N46-3 (BLPU) | Always | Below 1 Ω |
| N14-3 (FPV) - N46-4 (BLPV) | Always | Below 1 Ω |
| N14-4 (FPW) - N46-2 (BLPW) | Always | Below 1 Ω |
| N14-2 (FPU) or N46-3 (BLPU) - Body ground and other terminals | Always | 10 kΩ or higher |
| N14-3 (FPV) or N46-4 (BLPV) - Body ground and other terminals | Always | 10 kΩ or higher |
| N14-4 (FPW) or N46-2 (BLPW) - Body ground and other terminals | Always | 10 kΩ or higher |
Perform "Inspection After Repair" after replacing the fuel pump (for low pressure side).
Click hereEngine / Hybrid System>A25B-FXS (ENGINE CONTROL)>SFI SYSTEM>INITIALIZATION
| Proceed to |
|---|
| OK |
| NG |
OK
NG
| *a | Front view of wire harness connector
(to Fuel Pump Control ECU) |
Disconnect the fuel pump control ECU connector.
Connect the GTS to the DLC3.
Turn the power switch on (IG).
Turn the GTS on.
Enter the following menus: Powertrain / Engine / Active Test / Fuel Pump Single Phase Energization.
| Tester Display |
|---|
| Fuel Pump Single Phase Energization |
Operate the fuel pump control ECU using the Active Test function and measure the resistance according to the value(s) in the table below.
| Tester Connection | GTS Operation | Specified Condition |
|---|---|---|
| N15-2 (FPC) - Body ground | Before Active Test → During Active Test | Before Active Test: Resistance is stable → During Active Test: Resistance fluctuates* |
*: Using the Active Test, duty control of the transistors in the ECM will be performed. Due to the duty control, resistance of the FPC terminal will be unstable during the Active Test. If the resistance is stable before the Active Test and fluctuates while performing the Active Test, it can be determined that the transistor is operating. If the transistor does not operate during the Active Test, the ECM may be malfunctioning.
| Proceed to |
|---|
| OK |
| NG |
OK
NG
| *1 | No. 1 Engine Room Relay Block and No. 1 Junction Block Assembly |
| *2 | EFI-MAIN NO. 2 Relay |
Remove the EFI-MAIN NO. 2 relay from the No. 1 engine room relay block and No. 1 junction block assembly.
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| 3 (EFI-MAIN NO. 2 relay) - Body ground | Always | 11 to 14 V |
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Inspect the EFI-MAIN NO. 2 relay.
Click hereEngine / Hybrid System>A25B-FXS (ENGINE CONTROL)>RELAY>ON-VEHICLE INSPECTION
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Remove the EFI-MAIN NO. 1 relay and EFI-MAIN NO. 2 relay from the No. 1 engine room relay block and No. 1 junction block assembly.
Remove the No. 1 integration relay and EFI-MAIN NO. 3 relay from the No. 1 engine room relay block and No. 1 junction block assembly.
Remove the No. 1 integration relay and EFI-MAIN NO. 3 relay connected between the checked terminals as the coil inside the relay influences the measurement value.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| 5 (EFI-MAIN NO. 1 relay) - 2 (EFI-MAIN NO. 2 relay) | Always | Below 1 Ω |
| 5 (EFI-MAIN NO. 1 relay) or 2 (EFI-MAIN NO. 2 relay) - Body ground and other terminals | Always | 10 kΩ or higher |
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Remove the EFI-MAIN NO. 2 relay from the No. 1 engine room relay block and No. 1 junction block assembly.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| 1 (EFI-MAIN NO. 2 relay) - Body ground | Always | Below 1 Ω |
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Remove the EFI-MAIN NO. 2 relay from the No. 1 engine room relay block and No. 1 junction block assembly.
Disconnect the fuel pump control ECU connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| 5 (EFI-MAIN NO. 2 relay) - N15-1 (+B) | Always | Below 1 Ω |
| 5 (EFI-MAIN NO. 2 relay) or N15-1 (+B) - Body ground and other terminals | Always | 10 kΩ or higher |
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Disconnect the fuel pump control ECU connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| N15-3 (GND) - Body ground | Always | Below 1 Ω |
| Proceed to |
|---|
| OK |
| NG |
OK
NG